Title Page

  • Rough In

  • Conducted on

  • Prepared by

  • Location & Builder

Untitled Page

  • Is the rough in 100% complete (photos)

  • Site board photo, or electrical box photo

  • Photo of water meters

  • Recycled water Ready for R2 (If not required press N/A)

  • Are all holes siliconed?

  • Is house under water pressure

  • Vent pipe flashed

  • Has lockup been completed?

  • Has gasline been duct taped?

  • Gas test photo

  • Gas meter line capped off

  • Are all garden taps & Alfresco points installed

  • Are all mixers installed

  • Jackhammering needed on this job? (Photos if needed)

  • Fridge point roughed in

  • Are all stacks completed and water tested?

  • Additional Notes & Photos - Upload here

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.