Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Work Inspection ( to be completed prior to beginning work)
-
Plans have been picked up and signed for.
-
Purchase order has been received or picked up.
-
Framing items for plumbing are complete.
-
Temporary stairs are in place, if required.
-
Temporary handrails are in place, if required.
-
Safety bracing is in place.
-
Tubs are placed in bathroom areas.
-
Deadwood has been installed behind shower stall for door installation.
-
Blocking or deadwood has been installed as required.
-
House is clean, broom swept, and free of prior trade contractors debris.
-
Site Superintendent:
-
Trade Contractor: Company Name (printed)
Final inspection: ( to be completed before Trade Contractor leaves job site)
-
Lines are dug and completed.
-
Tubs, showers, etc., are set.
-
All piping is installed.
-
Drains are installed.
-
No solder or flux is on floor areas.
-
All safety bracing, temporary handrails, etc are still in place.
-
Rough plumbing inspection has been passed.
-
House is clean and free of debris.
-
House is broom swept.
Summary
-
Date: Project superintendent:
-
Trade Contractor: Company Name:
-
Project manager