Audit

CLOSURE
Select date
Runway
Add signature
AIRPORT AUTHORITY ACTIONS

1. Inform ATC WM of planned runway closure time by phone

DETAILS

2. In coordination with ATC, the worksite will be delineated by suitable barriers where appropriate. This requirement keeps all vehicles together and stops them straying.

3. Subject to traffic and weather conditions, the above action can be carried out before the runway closes.

4. ADM issues relevant NOTAM.

AIR CONTROLLER'S PROCEDURES

1. Ensure that the following message is included in ATIS broadcast one hour before the planned closure time: "Be advised, runway xx/xx closure is planned to commence at (time)"

At the runway closure time the Air Controller is to:

1. Inform ADM when the last runway movement has occurred.

2. Deselect he appropriate runway and approach lighting when requested by the BIAL ADM. No training approaches will be permitted to the closed runway during WIP.

3. Switch off the ILS (Prior coordination must be effected with DEO during hours of engineering duty).

4. Put appropriate "blocker strip" in the runway bay.

5. Advise APC that runway xx is closed.

6. Confirm with the ADM that the runway is closed at (time).

7. Annotate the Watch Log.

Add signature
WATCH MANAGER'S RESPONSIBILITIES

On receipt of confirmation of the planned closure time from the BIAL ADM, the ATC WM is to:

1. Inform DEO.

2. Inform APC and any other local agencies who need to know.

3. Ensure ADC has completed above tasks.

4. When the above actions have been completed, inform the ADM that "All ATC/Engineering checks are complete".

RE-OPENING
Select date
AIRPORT AUTHORITY ACTIONS

The ADM will inform ATC in advance of the final runway inspection to permit ADC to select the appropriate runway, approach lights and ILS.

1. The ADM (or his appointed representative) will ensure that all vehicles have vacated the manoeuvring area, all barriers have been removed and the runway has been inspected before handing over the runway.

2. ADM will then advise ATC via RTF that runway xx is available for use.

WATCH MANAGER'S RESPONSIBILITIES

On receipt of confirmation of the planned re-opening time from the ADM, inform:

1. DEO.

2. ATC.

AIR CONTROLLER'S PROCEDURES

Only after the ADM has handed back the runway via RTF, ADC will:

1. Select the appropriate lighting if required.

2. Request that DEO switch on ILS (if required).

3. Remove the runway "blocker strip" from the runway bay.

4. Advise APC that runway xx is available for use.

5. Remove ATIS message.

6. Annotate the Watch Log.

Add signature
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.