Information
Runway Direction Change Checklist
-
Applicable ONLY for reciprocal runway operations.
-
Enter reason for change:
Before permitting a runway direction change these items MUST be completed:
-
Co-ordinate with APC and agree transition point to new direction.
-
Select AGL as required.
-
Advice RFFS.
-
Change Approach Path Monitor as required (actioned by ADC).
-
Advise PC (actioned by INT or ADC as appropriate).
-
Update EFPS Info Bar.
The following items SHOULD be completed as soon as possible:
-
Update ATIS and ATIS messages as required.
-
Update ADC Log.
-
Update runway-in-use in FIDS.
-
ADC to advise SCOD that checklist is complete (if appropriate).
-
Previous runway-in-use
-
New runway-in-use
-
Add signature
-
Select date