Information
-
Document No.
-
Audit Title
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Offices/Documentation
-
Switching position tidy and well organised.
-
Company statutory notices displayed and in good condition.
-
Key Safe and keys labelled with key safe numbers and key numbers.
-
All key cabinets labelled as to their function, contents tidy. Keys and their cabinet positions labelled.
-
Switching diagram displayed and up-to-date. Permanent fashion.
-
Responsibility Schedule. Telephone directories/lists available.
-
Mess Rooms, toilets, washrooms clean, tidy and adequately provisioned. Are there any leaks from drains of sanitary systems?
-
First aid box and contents available and correct.
-
Fire Plan displayed and up-to-date, fire notices clearly displayed with correct information.
-
All fire extinguishers and their locations should be clearly marked with a unique number/operating instructions clear.
-
Notices on display at each Substation include:-<br>(a) NGC Safety Rules<br>(b) Treatment of Electric Shock<br>
-
Access to fire extinguishers and fire exits should be free from obstruction.
Equipment Room/Equipment
-
Battery Room designated "No Smoking" Area.
-
All switches on LVAC Boards clearly labelled in a permanent fashion.
-
Relay Rooms equipped with plastic curtains which have directional arrows attached.
-
All storage cupboards labelled as to content. Interiors tidy and contents identified.
-
All rooms, floors, windows, window sills clean and in good decorative order.
-
Paintwork and brickwork in good condition and clean.
-
Is "No Smoking" policy observed.
-
All equipment in good order and presenting no visible danger to staff.
-
Crane maintenance records up-to-date.
Aux Plant and Buildings
-
Earthing equipment inspected, stored properly and in sound condition.
-
Sufficient demarcation equipment available and in sound condition.
-
Compressor Room.<br>Valves labelled unique number on equipment as well as control board and guards in good condition and in position.<br>Drawing available/permanently displayed.<br>
-
Hearing protection notices displayed where required (diesel, compressor rooms).
-
Room tidy and rubbish container empty.
-
Oil Room<br>"No Smoking" notices displayed.<br>
-
Oil valves correctly/uniquely marked. Drawing available.
-
Access ways clear of obstructions, marked if appropriate.
-
All guards on machine tools, lathe miller, grinders.<br>Emergency stops labelled.<br>
-
Grinding wheel, max spindle speed disc size marked.
-
Protection of eye notices displayed and goggles available.
-
Lighting and heating satisfactory (including emergency).
-
Equipment and spares stored in tidy and safe manner.
-
Portable equipment correctly inspected and identified.
-
Correct colour code displayed for lifting tackle.
-
Chemical substances stored correctly and labelled.
-
No fire hazards.
-
All guards, doors and covers in position and secure.
Site/Buildings/Stewardship
-
All equipment clearly identified.
-
Site generally free of debris, weeds, unused equipment, scaffolding.
-
Site fence and gates in sound and secure condition. 1 metre clear walkway (external) and not compromised by materials, vehicles etc. All gates locked.
-
Ladders in good condition, secured.
-
Site free of unguarded excavations, broken trench covers etc.
-
Any signs of pollution, oil release to drains/trenches etc.<br>Plinths free of oil.<br>
-
Hearing protection notices displayed where required (transformer housings, gates).
-
Any materials on view (that may encourage theft).
-
Are site security systems functioning?
-
Substation gates and fence labels in order.
-
Emergency equipment in good order eg eye wash bottles.
-
Safe working area demarcation correct.
-
Caution/Danger Notices correctly used.
-
Protective equipment in use/available.
-
Is outdoor lighting satisfactory?]
-
Good housekeeping in buildings and rooms is of a high standard.
-
Check that relevant planned inspections have been carried out.
-
Check on progress of defect reports from previous inspections.
-
Equipment, drawings and spares stored/filed in correct and tidy manner.
-
Check staff awareness of Emergency incident Procedures.
-
No spillages on site or in buildings.
Safety Equipment/Procedures
-
Adequate and suitable protective clothing and equipment is available for use and in good condition.
-
Personal protective clothing and equipment is being used.
-
Contractors safety measures and procedures in place/in use.
-
Correct equipment and safe methods of work being used.
-
Any contractors on site are aware of their defined work.
-
Visitors safety helmets available and fitted with ear defenders.
Supervision
-
The staff carrying out site work understand the roles of Team Leader and GSS & PIC.
-
Site presence recording compiled with and up-to-date (including Visitors Book).
General Comments
-
Write any general comments here: