Information
-
Document No.
-
Project Name
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site survey
-
Room information
-
Ceiling construction
- concrete
- manufactured (plasterboard)
- suspended ceiling
- open wood beam
- metal sheet
- concrete filled metal
- other
-
What is construction?
-
Ceiling pictures
-
Wall construction
- concrete
- block
- brick
- block with plasterboard
- brick with plasterboard
- stud work with plasterboard
- stud work ply lined plasterboard
- mdf
- other
-
What is construction?
-
Wall pictures
-
Room dims
-
Ceiling height including any voids
-
Install date estimate
-
Trunking route pictures
-
Sketch pad
visual
-
Display type
- projector/ manual screen
- projector/ electric screen
- projector/ interactive board
- projector/ no screen
- plasma/ LCD/LED
- other
-
Projector brightness (lumens)
-
Is power available at high level
-
Describe what fixing was used!
-
Projector mounting location
-
Distance to bottom of image to floor mm
-
Fixing method screen
- screws
- anchor fixings
- chemical
- plasterboard fixings
- wooden pattress
- coach bolts
- other
-
System inputs
- video
- s-video
- component
- VGA
- DVI
- HDMI
- hdmi/dvi over cat5
- rs232 control
- network
-
Was display plugged into client network?
-
Port number and device MAC address
Install audio
-
Speaker type
- passive small system
- passive large system
- powered small system
- powered large system
- 100v/70v
- ceiling mounted
- wall mounted
- N/A
-
Speaker cable type (passive)
- .75mm stranded
- 1.5mm stranded
- 2.5mm stranded
Powered speaker
-
If powered has the auto standby option been used ?
-
Speaker input type (powered)
- 3.5mm (
- twin RCA
- captive screw
- XLR
-
Record speaker impedance and if 100v/70v what taps have been set too!
Control system
-
Control system make<br>
-
Panel type
- button panel
- touch panel
- tablet
- wired
- wireless
-
Image of panel
-
If plugged into client network what port used and MAC address of panel
Post install
-
Room tidy
-
Hoovered?
-
All installed equipment wiped over and clean?
-
Rubbish sorted and removed from room?
-
Engineer sign room clean
-
Job fully installed and fully working
-
Engineer sign
-
Client sign
-
What is not working and why
-
Engineer sign