Title Page
-
Client company
-
Job number
-
Work scope
-
Site Location
-
Conducted by
-
Main Client rep
-
Names of persons attending the site visit
-
Can client reveal budget or competitors
-
Please list competitor or budget
-
Who is the decision maker
-
what are the payment terms
-
Will we need to be on the clients approved contractor system
-
Are we already on the approved contractor listing
-
Get the details of the percurrent department
-
Do we need to build in a discount contingency
-
What percentage is required
-
Do we invoice the same main client
-
Who do we invoice
-
Day rate or price
-
Will the works involve a percentage of project retention
-
What retention rate is required
-
Are all the client's and site visit personnel contact details collected and my details shared.
Rams planing
-
Is there a head of health and safety
-
Is there a permit system in place
-
Will the site supervisor need to take a permit acceptors course
-
Will a client rep need to supervise the work
-
Are the emergency access and egress routes easily identifiable.
-
Will the emergency routes be highlighted in the main site induction
-
Is there special requirements needed for COSHH
-
Is there special requirements needed for waste
-
-
Will we need to arrange a skip or other specialist waste disposal
The Work site
-
How will the team access the site
- Issued keys and passes on site
- Issued keys and passes off site
- Security on site at all times
- Client / site manager on site at all times
-
Can the work team use the lifts
-
How many flights of stairs is there
-
Is There site parking
-
Please provide alternative
-
Type of roof access
- Roof hatch
- Ladder access
- MEWP access
- Window
- Fixed Ladders
- External stair case
- Fixed steel walkways
- Combination
- Scaffolding
-
Type of site
- School
- Factory
- Shopping centre
- public resource
- power generation and utilities
- Private offices
- Air port
- Railway affected
- Docks
- Residential
-
Type of work
- Structural inspection
- Structural maintenance
- ETFE roof system
- Cleaning works
- Fall protection
- Tensile Fabric
- Painting
- NDT Inspection
- Rigging and lifting
- Bird protection
-
Please note RAL Code
-
Is the structure Listed
-
Please give grade of listing
-
Method of access most applicable
- Rope Access
- MEWP
- Tower scaffolding
- Ladder Access
- Fixed Cradle
- Mobile Cradle
-
Dose the work involve confined spaces
-
Please list equipment needed
- Escape sets
- Gas monitors
- Rigging frame
- Forced air
- Additional task lighting
-
Is there restrictions on working times
-
Is there site welfare facilities available on site
-
Is there a secure site storage for tools and equipment.
-
Dose the work require, working outside normal working hours
-
Type of Shifts required
-
Is working at height necessary
-
Is the client aware of the risks involved with working at height.
-
Is there a risk to the public
-
Is there adequate resources to remove the risk to the public
-
Please describe the relevant provision
-
Is there a requirement for a site induction.
-
Is there a need power and water on site
-
Please give location and length hose / cable
-
Can the client supply site drawings and reports
The team
-
Size of team
-
Skill set of team
-
Specialist Qualifications
-
Please list requirements
-
DBS Check required
-
Is there accommodation required
-
Site qualifications
- Roof hatch
- Ladder access
- MEWP access
- Window
- Fixed Ladders
- External stair case
- Fixed steel walkways
- Combination
- Scaffolding
Materials, drawings and specialist equipment
-
Is there a requirement to supply materials
-
Can the client supply the materials
-
Is there a RAL match required
-
Is there a requirement for specialist tools and equipment not in the stores or readily available.
-
Please list what is required
Rope Access requirements
-
Will there be a need for an advanced team rescue
-
Is there a requirement for specialist rescue kit on site
-
Please list equipment needed
-
Type of rope access required
- Straight ropes
- Deviated ropes
- Re belays
- Aid Climbing
- Bolt climbing
- Tensioned lines
- Combination of methods
-
Are there obvious sharp edges visible
-
Please highlight type of rope protection required
-
Can the sharp edge be avoided with rigging differently
-
What equipment is required for rope protection
- Canvas rope protection
- Kevlar rope protection
- Isolated steel strop
- Gating device
- Bespoke solution
-
Types of anchors required
- Pre installed eye bolt
- Hanger bolts
- Structural steel
- The building structure
- Davit arms
- A frame
- Dead weight
- Abseiling rail
- Up and over
- Building section removal to find anchors
- Abseil posts
-
Are the anchors tested
-
Will we need to test the anchors
Plant and equipment required
-
Is there a needed for lifting equipment
-
Is there a need for equipment not in stores
-
Is there a requirement for ordering equipment in advance
-
Is there a need for drivable lifting equipment
-
Is there a need for a MEWP
Additional work opportunities
-
Are there additional job opportunities
-