Title Page
-
Site Address
-
Project Name
-
Date
Untitled Page
-
HAS A NEW DISTRIBUTION BOARD BEEN FITTED?
-
DOES THE BOARD HAVE A LOCK?
-
DOES THE DISTRIBUTION BOARD HAVE CORRECT LABELS FITTED?
-
HAS THE DB BEEN FITTED WITH A DB SCHEDULE?
-
HAS THE DB GOT AN ASSET TAG NUMBER?
-
HAS THE DB GOT A GUARDIAN QR/TAG?
-
IS THE CABLE SUPPLYING THE BOARD CORRECTLY INSTALLED?
-
HAS THE SUB MAIN CABLE BEEN CLEARLY LABELLED WITH IDENTIFICATION?
-
HAVE ALL THE BLANKS BEEN FITTED?
-
HAS A SPD UNIT BEEN INSTALLED?
-
IS THERE SUFFICIENT CONTAINMENT FOR THE INSTALLATION?
-
IS THERE RCD PROTECTION FOR SOCKET CIRCUITS LESS THAN 32 AMPS?
-
IDENTIFIED THE OUTGOING WAYS TO BE CHECKED (LIST)
-
HAS A CERTIFICATE BEEN ISSUED AND IS IT CORRECT AND MATCHING THE INSTALLATION?
-
HAS THE CERTIFICATE BEEN UPLOADED TO TESCO PROJECT, TESCO PRC?
-
ITEMS CHECKED
-
CONCLUSION