Title Page
-
Document No.S.C.C
-
Client Job reference.
-
Sensus Job reference:
-
Conducted on
-
Prepared by
-
Job Address
-
Customer name
Site Quality Audit
Cleanliness
-
Has the work area been left clean with all waste or surplus material been removed from site?
-
If no what works are required ?
-
What trade is responsible?
- Awning specialist
- Bricklayer
- Carpenter
- Electrician
- Fencer
- Glazer
- Concreter
- Roofer (Metal)
- Roofer (Cement Tile)
- Asbestos removal specialist
- Plasterer
- Painter
- Plumber
- Plant operator
- Ceramic tiler
- Cabinet Maker
- Scaffolder
- Shade Sail Specialist
- Water-Proofer
- Labourer
-
Photographs of issue
-
Action taken to rectify?
-
Photographs of work areas.
Workmanship
-
The following areas are areas inspected as part or Sensus Q.A Audit for workmanship and materials used and scope completion.
Room or area where repairs actioned?
-
Room/ Area name.
- Bed 1
- Bed 2
- Bed 3
- Bed 4
- Bed 5
- Guest Bedroom
- Ensuite
- Bathroom 1
- Bathroom 2
- Ensuite 2
- Lounge
- Rumpus
- Parents retreat
- Media
- Sunroom
- Deck
- Patio
- Balcony
- Kitchen
- Combined Kitchen Dining Living
- Laundry
- Study
- Office
- Garage
- Shed
- Roof
- Carport
- Roof
- Pool House
- Toilet
- Store
- Verandah
-
Photographs of room where materials and standards have met required standards.
-
Has all works met the required standards?
-
If no what is required?
-
What trade is responsible for rectification works?
- Awning specialist
- Bricklayer
- Carpenter
- Electrician
- Fencer
- Glazer
- Concreter
- Roofer (Metal)
- Roofer (Cement Tile)
- Asbestos removal specialist
- Plasterer
- Painter
- Plumber
- Plant operator
- Ceramic tiler
- Cabinet Maker
- Scaffolder
- Shade Sail Specialist
- Water-Proofer
- Labourer
-
Photograph of defect.
-
Date defect minor omission to be rectified by.
-
If answer yes, add photographs of area for audit.
-
Audit pictures of room / area meeting required standards.
Customer Satisfaction
COMPLETION CERTIFICATE
Signature of Owners / Owners representative and Contractor's.
-
The Owners / Owners representative and Contractor agree the works are complete except for minor defects and or omissions which all parties have agreed will be actioned by the agreed dates. Where there are items listed where the Contractor does not agree with both parties agree to mediation as per the contract conditions or third parties as agreed by both parties.
-
1.Owners/ Owners representative signature.
-
2.Owners/ Owners representative signature.
-
Contractor's Representatives signature.