Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Service / Energy Isolation

  • Conduct a risk assessment to determine the requirements of isolation in the workplace and document the findings in the HIDRA.

  • Ensure employees are familiar with the isolation processes prior to working on potentially hazardous equipment.

  • Ensure isolation permit is raised where required.

  • Ensure plant and systems services/energy is effectively tested as being isolated before commencing work.

  • Ensure the electrical equipment, including (RCD,s) Residual current device is recorded on a central register and is inspected and tested.<br>Portable generators requiring earthing mechanisms are to be employed where necessary.

  • Ensure that electrical leads tagged ,are of the ground and are adequately protected and are less than 30m in length.

  • Conduct an isolation audit.(verify that isolation audits are being conducted where these activities are being undertaken.)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.