Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
PROJECT:
-
LOCATION:
-
Jobsite
-
Client
VERIFICATION:
-
Construction drawings approved for use
-
Drg. No
-
Rev. No.
Checklist
-
1. Screwed or nailed to formwork
-
2. Not clashing with steel or other services
-
3. Are alterations to design required
-
4. Alterations approved by builder/designer
-
5. PVC pipe inserts installed to correct level with dust caps
SETOUT
-
Marked out as per drawing
-
Checked set out with both Hydraulic and architectural
MATERIALS:
-
Pvc
-
Copper
-
Hydrant
SIGN OFF:
-
CHECKED BY:
-
SIGNATURE:
-
Date