Title Page

  • Job Number

  • General Contractor

  • Conducted on

  • Project Manager

  • Temperature

  • Location In Building

  • Confirm MEP in riser shaft are inspected and signed off

  • Notes

  • Add media

  • Confirm bottom track attached per plans and specs

  • Notes

  • Add media

  • Check shaft wall studs are short of top track, per plans and specs

  • Notes

  • Add media

  • Confirm linear panel joints stagger per plans and specs

  • Notes

  • Add media

  • Confirm fire damper framing installed per manufacturer data

  • Notes

  • Add media

  • Confirm shaft wall liners screwed to J-Runner per plans and specs

  • Notes

  • Add media

  • Confirm overhead enclosures are anchored per plans and specs

  • Notes

  • Add media

  • Confirm safing is installed on top of shaft liner for fire-stopping spray (Where applicable)

  • Notes

  • Add media

  • Confirm elevator door openings are stiffened per plans and specs (if applicable)

  • Notes

  • Add media

  • Confirm no screws through liner panels into elevator hoisting

  • Notes

  • Add media

  • Sign Off

  • Forman

  • Q.C. Sign Off

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.