Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Information
-
Enum ID and Name
-
Add location
-
Date of Notification
Hardware
-
1 . DCDU unit(s) installed (as per industry/Bell Mobility standards and Engineering specs)
-
2. BBU unit(s) installed (as per industry/Bell Mobility standards and Engineering specs)
-
3. Fiber X-connect unit(s) installed (as per industry/Bell Mobility standards and Engineering specs)
-
4. Transport unit(s) installed (as per industry/Bell Mobility standards and Engineering specs)
-
5. Cable management bar(s), standoffs and shields
-
Notes
Cabling
-
1. DCDU cables installed from power plant breakers to DCDU unit(s) with lugs and heat shrinks
-
2. DC cable installed from RRUs to DCDU(s) power tested by each corresponding sectors
-
3. DC cable installed from Transport unit(s) power tested
-
Notes
Labelling
-
1. All power and data cable labels installed as per industry standard
-
2. IP information and addresses identified
-
Notes
If New Shelter - To Be Completed
-
1. Fire Extinguisher, Log Book, Table, Chair, Garbage Container delivered with shelter
-
2. Holes plugged from exterior environment
-
3. Grounding inside/outside shelter
-
4. Draft stopper/protector installed on door
-
5. AC power outlet, Hydro, Heating, Heating, Air Conditioning - all operational
-
6. If T Cabinet, Air Exchanger operational
-
7. Inter-building Fire connection completed
-
8. Power Plant(s) - all with the latest boot rom, software and config version
-
9. IP configuration and Transport confirmed
-
Notes
Miscellaneous
-
1. House keeping and site cleaned
-
2. All alarm contacts and verified by NOC/Netrac
-
3. As Built photos uploaded to FMLS
-
4. NRM populated
-
Notes
Test Calls
-
CallP completed on both Bell and Telus
-
E911 results sent to E911results@bell.ca
-
Comments
-
Bell Implementation Technician
-
Date
-
Signature