Information

  • Builder

  • Site address

  • Conducted on

  • Prepared by

Site access

  • Access to front door clear of debri

Deliveries

  • Delivery date

  • Install date

  • Truck access available

  • Material ingress to site

Frame

  • House clad

  • Noggins installed where needed, ie, change of direction

  • Rough in complete

  • Wired

  • Alfresco battened

House keeping

  • House clear of building material and debri

  • House swept out

Amenities

  • Power to site

  • Water on site

  • Toilet on site

  • Bin available

Other

  • Boral sign in window

  • Stair void in place

  • Insulation installed

  • Roof water tight

Conclusion

  • Site plaster ready

  • Place job on hold

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.