Title Page

  • Document No.

  • Conducted on

Inspection Information

  • Inspected By:

  • Location:
  • Select date

  • Contractor:

  • Contractor's Representative:

  • Work Activity:

Site Personnel

1.0 Site Personnel

  • 1.1 Are site personnel wearing appropriate PPE and any SWMS safety gear?

  • Add media

  • 1.2 Are Safety Passports/Training Records available?

  • Add media

  • 1.3 Are the appropriate training requirements current?

  • Add media

Contractor's, Visitors and Site Acces

2.0 Contractors, Visitors & Site Access

  • 2.1 Is the Site Specific Safety Management Plan available?

  • Add media

  • 2.2 Are appropriate SWMS's / WARA's / PWRA's included in the documentation at site?

  • Add media

  • 2.3 Is the site appropriately secure (fenced, gates, signs, etc)?

  • Add media

  • 2.4 Is the general site housekeeping of an acceptable standard?

  • Add media

  • 2.5 Is a copy of all site records adequate and available? (Inspections, Inductions, Incident Reports, Training Records, Visitors, CAR's, NCR's)?

  • Add media

  • 2.7 Are actions arising from previous site safety & environment inspections complete?

  • Add media

  • 2.8 Are site entry requirements & emergency contact details displayed?

  • Add media

  • 2.9 Are all requirements of the Site Safety Management Plan being complied with?

  • Add media

  • 2.6 Have affected stakeholders (landowners etc) been notified of the site works?

  • Add media

Emergency Requirements

3.0 Emergency Requirements

  • 3.1 Are emergency procedures available on site (Environmental, Fire and Evacuation Plans)?

  • Add media

  • 3.2 Are site details (phone, address) available and displayed?

  • Add media

  • 3.3 Are low voltage rescue kits appropriately available?

  • Add media

  • 3.4 Are first aid kits readily available and current?

  • Add media

  • 3.5 Is there appropriate and current fire fighting equipment in site?

  • Add media

Environmental

4.0 Environmental

  • 4.1 Has an appropriate environmental assessment been completed for the work?

  • Add media

  • 4.2 Have all identified control measures been implemented?

  • Add media

  • 4.3 Is there an Erosion &Sediment Control Plan (ERSED) and have controls been implemented?

  • Add media

  • 4.4 Is an oil/simplified drainage diagram available on site?

  • Add media

  • 4.5 Are environmental spill kits available on site?

  • Add media

  • 4.6 Are stored fuels, chemicals & oils bunded?

  • Add media

  • 4.7 Are waste materials being appropriately stored and disposed of?

  • Add media

  • 4.8 If required, are relevant permits in place for the work activities?

  • Add media

TransGrid Safety Rules

5.0 TransGrid Safety Rules

  • 5.1 Are safety rules being complied with the current work?

  • Add media

  • 5.2 Is the work area correctly arranged?

  • Add media

  • 5.3 Are PMWI or LVPRI isolationist being completed appropriately?

  • Add media

Risk Management Assessment

6.0 Risk Management Assessment

  • 6.1 Has an appropriate pre-work risk assessment been suitably completed for all activities?

  • Add media

  • 6.2 Has a fire risk assessment & control measures form been completed, and are the control measures being adhered to?

  • Add media

  • 6.3 Is there a safe work method statement available for the activity?

  • Add media

  • 6.4 Have the identified controls on PWRA and SWMS been implemented?

  • Add media

  • 6.5 Have employees attended a tool box meeting in the last 2 weeks?

  • Add media

  • 6.6 Is the work properly planned, including the specific manual handling aspects of the work identified in the risk assessment?

  • Add media

  • 6.7 Is there a hazard whiteboard and if so is it in use and up to date?

  • Add media

Working at Heights

7.0 Working at Heights

  • 7.1 Has the working at heights hierarchy of controls been addressed & documented in the PWRA?

  • Add media

  • 7.2 Are staff working 2m above ground level attached?

  • Add media

  • 7.3 Are two staff trained and competent in EWP and rescue?

  • Add media

  • 7.4 Are emergency descent kits available in the EWP?

  • Add media

  • 7.5 Are ladders in proper use (<4:1, tied off, etc)?

  • Add media

  • 7.6 Is climbing equipment correctly stowed, in good order and in date?

  • Add media

Chemicals, Dangerous Goods, etc

8.0 Chemicals, Dangerous Goods etc.

  • 8.1 Are chemicals, hazardous substances or dangerous goods on the work site clearly labelled and appropriately stored?

  • Add media

  • 8.2 Is there a safety data sheet (SDS) for chemicals or dangerous goods in the work site?

  • Add media

  • 8.3 Is there a hazardous substance register available on site?

  • Add media

General Electrical Safety

9.0 General Electrical Safety

  • 9.1 Is a safety observer required, and if so, are they present and performing only that duty?

  • Add media

  • 9.2 Do all required electrical tools and equipment have current inspection tags?

  • Add media

  • 9.3 Are electrical leads tagged and appropriately protected from mechanical damage and moisture?

  • Add media

  • 9.4 Are 240V portable electrical tools in use protected by earth leakage devices?

  • Add media

Mobile Plant

10.0 Mobile Plant

  • 10.1 Are mobile plant maintenance records available?

  • Add media

  • 10.2 Have daily pre start checks been completed for mobile plant?

  • Add media

  • 10.3 Is there evidence of mobile plant operator's competency, familiarisation and experience?

  • Add media

  • 10.4 Is there a documented process for refuelling of mobile plant?

  • Add media

Other General Items

11.0 Other General Items

  • 11.1 If binding & bridging leads a re available/required. Are they of suitable standard and applied correctly?

  • Add media

  • 11.2 Is there an approved excavation permit available for any excavation work that is occurring

  • Add media

  • 11.3 Are excavations appropriately covered or barricaded off?

  • Add media

  • 11.4 Have trailing earths been attached where required?

  • Add media

  • 11.5 Are confined spaces signs posted and locked?

  • Add media

  • 11.6 Is there appropriate earthing on gates and fenced?

  • Add media

Follow Up

FOLLOW UP

  • Follow Up Items:

Sign-off

SIGN OFF

  • Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.