  • Project Title

  • Work Order/ Job Voucher Number

  • Issuing Manager

  • Contractor

  • Contract Number

  • Conducted on

  • Conducted by

  • Site Address

Site Control Sheet Checklist

Clarity about the job (Sections A-B)

  • Are roles and responsibilities and points of contact on site clear?

  • Are permitry requirements (incl. SCO) up to date and being adhered to?

  • Is the contractor clear on their scope of work and working to a plan?

  • Is the contractor aware of and taking account of the key hazards and pre-construction information?

  • Has the contractor got adequate supervision and monitoring in place?

  • Does the use of any sub-contractors by the contractor appear to be well managed?

  • Is it clear which risks are being managed by Cadent Gas (e.g. SCO) and which the contractor is managing?

  • Are site rules understood and adhered to by the contractor?

Site area and Handover (Sections C-E)

  • Has appropriate Signing, Lighting and Guarding been utilised on site?

  • Are the vehicles parked correctly and not causing an obstruction?

  • Are all site plans accurate, available and in date including gas and electric drawings?

Emergency Plan (Sections F-G)

  • Is a first aid kit available and in date?

  • Is there a process for reporting injuries?

  • Are procedures in place for all identified emergency situations?

RAMS check and Controls (Sections H-K)

  • Are the correct personnel on site and with evidence of qualifications available if required?

  • Does the risk assessment specify adequate CONTROLS and are these controls in place?

  • Can the contractor confirm that the correct equipment is being used on site and any tests or inspections are in date?

  • Can the contractor confirm that appropriate PPE is being used?

  • If temporary works are required has the temporary works design been checked by a competent person, registered on a temporary works register and been approved by a temporary works co-ordinate?

  • Are the contractors aware of and working to appropriate policies, procedures and standards specific to the work being undertaken? Is section M signed?

  • Has the contractor an up to date site specific risk assessment that adequately IDENTIFIES safety and environmental hazards?

Site Control Duties (Section L)

  • Is there evidence that people coming onto site are being inducted?

  • Is there evidence of control of safe access, egress and site demarcation?

  • Are welfare facilities appropriate for the work being undertaken?

  • Has the site register been updated? (At start of and during the work)

Scope or Changes on site (Section N)

  • Does the contractor know when and how to contact Cadent Gas if things change?

  • Have any changes of scope by Cadent Gas been actioned appropriately?

  • Is it clear who is in control of the work area(s)?

  • Have any changes on site been reflected in the RAMS, pre-authorised in the permitry and been appropriately briefed?

  • Contractor

  • Cadent Gas Supervisor

  • I can confirm that all necessary checks have been undertaken on the site and that all relevant paperwork is correct at the time of this check being undertaken.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.