Information

  • Site name

  • Conducted on

  • Prepared by

General

  • H&S signage in place, is visible and readable

  • Main hazard I'd board up to date and legible

  • Please take a photo of the site hazard I'd board

  • Sub contractor hazard ID report maintained

  • Access/ egress clear for emergencies

  • More than one exit where practical

  • Staff amenities in order i.e toilet, smoko shed

  • Good site house keeping and rubbish removal

  • All underground services located and marked

Protective equipment

  • PPE worn as per site signage and policy

  • All PPE in good working order and current

  • Confirm that the safety PPE box is fully stocked.<br>If not note below what requires re stocking.

Electrical

  • Extension cords and switches in good order

  • No visible damage to electrical sub-boards

  • Transformer/ ELCB being used

  • RCD circuits have been tested with testing device

Tools

  • No obvious physical damage, check tag date

  • Switches, leads and plugs in good working order

  • Guards in place and used correctly

Cranage

  • Check props are securely in place

  • PPE worn and staff briefed on process

  • Height work hazard noted and controls put in place

Excavations

  • Sides shored where necessary

  • Barricades installed around open excavations

Storage and handling

  • All materials safely stored/ stacked

  • Material safety data sheets available

  • Flammable/ gas materials stored safely

Height work

  • Ladders in sound condition and non slip

  • Building edges and stairwells are all scaffolded in accordance with current codes of practice

  • Guard rails/ mid rails/ toe boards all in place

  • Copies held of scaffolding register checks

  • Mobile/ prefab scaffolds erected in accordance with current codes of practice

  • Elevated work platform certificates in order

  • Operators of above have received instruction

  • Overhead lines identified

  • Underfoot channels and holes covered securely

Security

  • Site fencing in order and adequate

  • Adequate lighting

  • Locks in good working order

  • Plant and materials secured and out of sight

First aid

  • First aid kit maintained and well stocked

  • Accident register up to date

  • People trained in first aid available on site

  • Hot water available

Hot work procedures

  • Permits obtained where necessary

  • Welding screens being used as necessary

  • Water/ fire extinguishers available at hand

Other (specify)

  • All exposed reinforcing rod is capped

  • Weekly site photos. Please take a couple of general site photos for the weekly audit

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.