Title Page

  • Site conducted

  • Client

  • Principal Contractor

  • Site Foreman/Manager

  • Inspection Conducted on

  • Inspection Prepared by

  • Location
  • Weather conditions

  • Number of workers

  • Current work activities

  • Actionable items from previous report closed out?

  • Are there Risk Assessments & Method Statements approved

  • Are they Suitable and sufficient for the works being carried out and signed by all operatives involved in it’s entirety with regular monitoring of changes to processes or materials.

  • All works MUST stop until suitable and sufficient Risk assessments are in place, signed & approved

  • All WORKS regarding those RAMS must stop until suitable and sufficient RAMS have been supplied and approved

  • Have all Operatives and Visitors been given a Safety Induction

  • Is CoSHH suitably stored and controlled at site level

  • Dust and Noise suitably controlled

  • Is Hand Arm Vibration being controlled and adequately managed with active HAVS monitoring.

  • PUWER register Daily/weekly check sheets for Plant & Equipment?

  • Are there relevant operatives training records & competency cards?

  • Have tool box talks/safe briefings been delivered?

  • Are Fire/Emergency notices/equipment displayed?

  • Are welfare facilities provided and are adequate & clean?

  • Are first aid provisions and equipment provided?

  • Is there a Defibrillator onsite or near site that can be used in an emergency.

  • Are Certificates in place for temporary electricity in cabins.

  • Are PAT registers for the tools and equipment in place.

  • Is the suitable and sufficient Task lighting.

  • Is there a Traffic Management/Logistics plan displayed?

  • Does the traffic management plan mirror site traffic management.

  • Is the traffic management being adhered to onsite.

  • Are Access & Egress Routes in good order?

  • Are Excavations being managed correctly?

  • Is housekeeping/material storage compliant?

  • Are there suitable Waste Management Procedures in place? Recording of waste Transfer notes.

  • Is the use of Access Equipment Compliant ? (Scaffold, Towers, MEWPS etc)

  • Is working at Height suitably controlled

  • Are all Leading Edges & Potential Falls from Height suitably protected?

  • Has all edge protection got the TVC logo on show in good condition and legible.

  • Remove damaged / untidy or faded edge protection and replace with compliant panels

  • Are there Lift plans present and correct along with corresponding certificates for lifting equipment & accessories, plant and equipment thorough examinations in place?

  • Is Safety equipment & PPE being used correctly? Correct fitting PPE etc

  • Is RPE being worn on site ?

  • Does the operative have face fit training for the mask he is wearing

  • If NO Face Fit training for the mask being worn then they are required to stop works and someone who has the correct training to continue.

  • Are they clean shaven - the requirement is to be clean shaven at ALL times when wearing RPE.

  • Does this site have security/prevention of unauthorised access?

  • Is there adequate site signage (directional,warning, safety etc) on this site?

  • Were the work areas found to be in a safe, compliant condition?

  • Are gas bottles & flammable stored and used safely?

  • Actionable items - Risk & Hazards seen at site level.
  • Areas/Items of Risk.

  • Recommendation

  • Time Frame to close out

Sign off

I confirm that I have read and discussed the issues raised with the auditor.

  • Project/Site Manager

undefined

  • Person conducting this Audit.

undefined

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.