Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location GoogleMaps Link
Site Survey Details
-
What kind of project is this ?
-
Describe the Site or the Project ?
-
Underconstruction / In use already/Tenant Finalisation
-
Any specific Technology required by the customer or we have to propose ?
-
How many buildings are present on site?
-
Date and time of the survey?
-
Please upload a photo of the site layout.
-
Please upload site Photos
-
Distance Between main Entrance and Parking entry /exit ? (in mts)
-
width of the Parking Entrance ?
-
How many entrances for parking ?
-
How many Exits for parking?
-
Is there an existing Raceway ?
-
SI Partner with whom Survey was conducted with contact details .
-
Width of Parking Exit ?
-
Does Client have separate 2 wheeler and 4 wheeler lane ?
-
Any Existing Infrastructure ?
-
Is the Parking Indoor or outdoor ?