WHS Site Audit
-
Document No.
-
Client, Builder or Site Name
-
Conducted on
-
Prepared by
-
Location
-
Our personnel on site
-
Select date
Job or Project Details
-
Builders Name
-
Our Contractors Name:
-
Installation Stage
- excavation & groundwork
- slab or foundation
- first fix
- second fix
- handover
- other see below
-
Other:
-
Other trades on site
- Electrician
- Plumber
- Carpenter
- Roofer
- T/As
- Apprentices
- Bricklayer
- Plasterer
- Tiler
- Glazier
- Crane
- Concreter
- Forklift
- Excavator
-
Description of Works being done
-
Task(s) observed on site:
Risk Assessment:
-
Our JSA & Risk Assessments are up to date?
-
Worker(s) singed in to JSA & Site Register
-
Our Contractors Risk Assessment Complete?
-
All our workers inducted?
Site Work, Health & Safety
Electrical safety
-
RCD protection in place?
-
All mains powered equipment including cords and chargers Test & Tag current?
-
Power cords hung out of the way where possible?
Working at heights
-
Access equipment correctly used, equipment book signed, license on hand
-
Ladders suitable for task & in good condition?
-
Working @ Heights tasks done in a safe manner
-
Objects likely to fall from height?
-
Other risks of falls identified?
General
-
Good housekeeping practices applied?
-
Toilet & washroom facilities suitable and in good condition?
-
Fire protection in place?
-
First Aid available?
-
Manual handling tasks
-
Hazardous substances
-
Heavy Equipment operated safely
-
Excavations
-
Confined spaces
-
Noise level
-
Other hazards & risks identified
-
Attach picture
PPE
-
Proper gloves used
-
Dust mask or respirator worn
-
Hard hat
-
Work boots
-
Hi-Vis clothing or vest
-
Eye protection
-
Harness & fall arrest
-
Hearing protection
Observations
-
Observations on the work carried out, considering codes of practice, specifications, standards and regulations.
-
Attach picture
-
I confirm that I have been made aware of non compliance items highlighted above and ensure they will be addressed and rectified.
-
Signed person concerned
-
Signed (person completing report)