Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
F155 HW Installation Site Inspection Checklist 155
-
F155 HW Installation Site Inspection Checklist
Job Details
-
Street #
-
Street Name:
-
Suburb
-
State
-
Postcode
-
Customer Name
-
Sales Order Number:
Installer Details
-
If Contractor: Contractor Business Name:
-
Additional Workers Name
-
SG Office Manager
-
Plumber/Site Supervisor Name
-
Trade Assistant/s Name
-
Authorised Contractor
-
Worker Licensees & Competencies Valid
-
(Review SharePoint - Installation Contractor Register To Verify Contractor & Worker/s are Authorised)
Vehicle Inspection
-
Vehicle Registration Number
-
Tyres are in good condition
-
Spare Tyre is serviceable
-
Indicator Lights Functional
-
Braking Lights Functional
-
Seat belts functional
-
Seat belts in good condition
-
Vehicle clean and tidy
-
First Aid kit available
-
First Aid Kit Serviceable
-
First Aid Kit has personal items in it? (By law, personal care items such as Aspirin, Panadol etc are not allowed to be inside the first aid kit. If they are in, please remove them immediately)
-
Fire extinguisher available
-
Fire extinguisher serviceable
-
Materials and Goods are in good working order
-
Tie downs used to secure materials
-
Hiab Pre-start checklist completed?
-
MSDS (SDS) for all chemicals available?
-
Additional MSDS (SDS) required ?
Site Safety
-
SWMS presented to inspector
-
SWMS Completed
-
SWMS Completed Accurately
-
Gutter Guard In place
-
Ladder Tied Off
-
Fall Restraint / Fall Prevention PPE available at site
-
Fall Restraint / Fall Prevention PPE in use at site
-
Equipments Testing and Tags up to date?
-
Installer in Hi-Vis SG Uniform?
-
Installer Wearing Safety Shoes?
-
Other PPE Available?
Document Inspection:
-
(Presenting inspector with JSA is only applicable if works being conducted at the time of inspection)
-
Installation Checklist & Commissioning Checklist Completed?
-
Install & Commission Checklist Completed?
-
Electrical Safety Certificate Completed?
-
Gas Notice of Completion Ticket Completed?
Installation Inspection:
-
Installation of Hot Water Unit Completed?
-
Lagging/Saddling of Pipe work completed?
-
Temping Valve Installed?
-
System Operating Correctly?
-
Questions to ask customer if at home:
-
Pre-Installation discussion with client conducted?
-
Was client asked if s/he gives permission to fit sticker?
-
Was sticker fitted? (if yes, email photo evidence to sdhw.stickers@solargain.com.au)
-
Handover Completed:<br>Including system operation training, provision of all information and explanation of documentation)
-
Now generating sign installed:
Corrective Action Required
-
corrective Actions Required?
-
Corrective Actions To Be Completed:
-
Site Inspected By:
-
Date:
-
Signature: