Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
This template was created by Fire Safety Australia, please visit www.firesafetyaustralia.com.au
http://www.firesafetyaustralia.com.au
System Information
-
Insert System Specs & Testing Advice
Monthly Inspection / Test Schedule
-
Sound Equipment: Inspect to ensure clearly visible and readily accessible. Clean and correctly labelled
-
Warning System Test: Simulate an alarm condition and confirm alert and evacuation tones
-
Controls: Ensure all controls are returned to their normal position
-
Intercom Equipment: Inspect to ensure clearly visible & readily accessible. Clean and correctly labelled
Six Monthly Inspection / Test Schedule
-
Warning System Indication: Simulate an alarm condition via the fire system to automatic mode
-
Reset: Test the operation of the reset function
-
Aural Indicators: Test the operation of the aural indicators
-
Controls: Test the operation of all the required controls
-
Warden Intercom Points (WIP): Inspect to ensure clearly visible & readily accessible. Clean and correctly labelled
-
WIP: Inspect all WIP's to ensure there is no mechanical damage
-
WIP Operation Instructions: Inspect all instructions to ensure they are clearly visible and legible
-
Battery Enclosure Intercom System: Inspect battery enclosure for evidence of corrosion
-
WIP Location: Inspect all evacuation zones to ensure at least one WIP is installed
Yearly Inspection / Test Schedule
-
Call Points: Inspect all call points for any condition that is likely to adversely affect their operation
-
Visual Warning Devices (VWD's): Inspect all devices for any condition or damage that is likely to adversely affect their operation
-
Other Warning Devices: Inspect all devices to ensure that they are in place
-
Block Plan: Inspect block plans and zone drawings to ensure that they are legible and current
-
Battery Enclosure Sound System: Inspect enclosure for evidence of corrosion
-
Fault: Simulate a speaker, emergency call point, visual warning device and WIP fault for every circuit. Confirm indication
-
Fault: Simulate fault between the fire system and warning system and confirm indication at the warning panel
-
Visual Indicators: Test the operation of the LED and alphanumeric indicators
-
Battery: Test battery capacity if it has not been replaced within two years - Record results (Provide System Alarm Current & Final Voltage)
-
Ancillary Controls: Test the operational function and ensure device can be correctly initiated
-
Emergency Call Points: Test the operation of all installed emergency call points
-
Visual Warning Devices: Test the operation of all visual warning devices
-
Unprotected Areas: Test all areas - ensure system installed in accordance with the relevant installed standard
-
Functional Test: Confirm that the sound system tones are audible in all areas of the building
-
Override Test: Confirm that the alarm signal override non - emergency audible signals
-
WIP: Initiate a call from and to each WIP & confirm each WIP is indicating and clearly communicating with intercom panel
-
Warden Present Indication: Test the operation of the warden present indication
-
Interface and Control Test: Conduct a functional test with other interfaced systems. Verify with building interface schematic (Sprinkler System, Fire Detection System, other)
-
Battery: Replace if older than two years unless its satisfactorily passes a battery capacity test
Yearly Sound Pressure Level Test
-
Sound Pressure Test: Undertake tests to ensure sound pressure levels in all areas of the building meet the requirements of the Standard to which the system was installed
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
-
Provide: Area/Zone, Ambient Level dB & Max Level dB
Five Yearly Intelligibility Test
-
Intelligibility Test: Undertake tests to ensure speech intelligibility in all areas of the building meet the requirements of the Standard to which the system was installed
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
-
Provide: Area/Zone, Min CIS & Max CIS
Sign Off
-
Site Contact Name & Signature:
-
Technician Name & Signature