Start Up Checklist
-
This Check List is to be completed by a representative from Production, Sanitation and QC. The line is not permitted to start until all At Risk items have been corrected and all 3 members of the inspection team sign off on the inspection.
-
Conducted on
Line Inspection 1
-
Type of Check Being Done
-
Add Line Inspection
Line Inspection
-
Click here to Select Production Line Being Inspected
Cracker Kitchen
-
Mixer - Inside, Outside, Inlets
-
Dough Dumper
-
Dough Trough
-
Guillotine - blade, guards, catch tray, conveyor, touch screen
-
Proofing Belt / Metal Detector Conveyor - rollers, guide rails, scraper, catch trays, floor
-
Laminator Hopper, rollers, floor
-
Trim Return Conveyor, rollers, scraper
-
Flour Type Correct for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Laminator
-
Laminator Hopper, rollers, floor
-
Laminator Conveyors, rollers, scrapers, support structure, floor, guards
-
Laminator Program Correct for Next Order
-
Gauge Rollers, guards, scrapers, catch trays, belts
-
Relaxing Belt, rollers, scrapers, air
-
Rotary Cutter, belt, guard, anvil, rollers
-
Trim Return Conveyor, rollers, scraper
-
Salter - hoppers, belt, catch tray
-
Panner Belt, rollers, scraper
-
Oven Entrance, Interior and Exit
-
Oven Settings Correct for Next Order
-
Oil Type Correct for Next Order
-
Incline Conveyor, rollers, scraper
-
Flat belt, 90° Conveyors (2), catch trays
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Capper Room
-
Decline Belt, rollers, catch trays
-
Rotodex Infeed Slides
-
Capper Box - belt, guards, scraper, operator controls
-
Cream Heads
-
Capper Heads
-
Spiral Infeed Conveyor, guards, rollers, scraper, catch trays, floor
-
Spiral Entrance
-
Spiral Room - conveyor, walls, ceiling, floor
-
Belt 3 (along wall from capper) - rollers, catch trays, floor
-
Cream Mixer 1 - piping, pump, filter at flow plate
-
Cream Mixer 2 - piping, pump, filter at flow plate
-
Cream Holding Tank 2 - piping, pump, floor
-
Cream Holding Tank 3 - piping, pump, floor
-
Wash Bay 2 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Cracker TNA
-
Belt 5 Outfeed Conveyor - inside, rollers, floor
-
Tumbler Replacement Conveyor - inside, rollers, floor
-
Accumulator
-
Ceiling vents and ceiling tiles above cracker mezzanine - clean, in place, ceiling tiles seated correctly
-
Incline after Accumulator - inside, rollers, floor, inside motor guarding
-
Vibrating Conveyor After Accumulator, screen, dust collector
-
TNA Cone
-
TNA Buckets
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s) - WIP Station, totes
-
Blue Recycling Totes Emptied
-
Box Former - Inside, On Top, Floor
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Spiral Exit Belt, rollers, scraper, floor
-
Belt 3 - Along Wall from Capper, scraper, floor
-
Belt 5, rollers, covers, floor
-
Case Packer Infeed Conveyors
-
Box Blow Off Totes - Inside, Under
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Empty Case Conveyors
-
Case Packer - Inside, On Top, Floor
-
Case Labeler Set Up for Next Order
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Blue Recycling Totes Emptied
-
Case Wedge Conveyor and Conveyors to Palletizer
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Palletizer Stairs
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Cracker Boxing
-
WIP Station Clear - totes, floor
-
LJ Picker - Inside, On Top, Floor
-
Triliner - Inside, On Top, Floor
-
Blue Recycling Totes Emptied
-
Reject Bins/Table After Triliner - Inside, Floor
-
Laser Dater Set Up for Next Order
-
Operator Work Table(s)
-
Metal Detector Reject Cage Empty - By QC
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Productyion Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Granola Kitchen
-
Mixer - Inside, Outside, Inlets, Butterfly Valve
-
Chunker
-
Incline Conveyor (giraffe)
-
Conbar - hopper, rollers, scraper, catch tray, oil system
-
Inclusion Dispenser(s)
-
Rake(s)
-
1st Compaction Roller, scraper, catch tray
-
2nd Compaction Roller, scraper, catch tray
-
Woody, guard, pipes, hoses
-
Melter 1, pipes, pump
-
Holding Kettle 1, pipes, pump
-
Melter , pipes, pump
-
Holding Kettle 2, pipes, pump
-
Wash Bay 1 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Cooling Tunnel 1 - belt, doors, handles, rollers<br>Open all doors and inspect with a flashlight
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Guillotine
-
Steamer at cooling tunnel 1 and catch tray
-
Slicer - guard, anvil
-
Trim reject conveyor and UHMW slide
-
Spreader Cart, scraper, catch trays
-
Guillotine - blade, anvil, guards, catch tray, conveyor, touch screen
-
Enrober
-
Holding Tanks, pipes, pumps
-
Guillotine Melter
-
Enrober Replacement Conveyor, scraper, catch tray
-
Steamer at cooling tunnel 2 and catch tray
-
Cooling Tunnel 2 - belt, doors, handles, rollers<br>Open all doors and inspect with a flashlight
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 1
-
DFR (trombone) Conveyors - guards, rollers, scrapers, bar aligners, catch trays
-
Metal Detector - Inside, outside, conveyor, bar aligner, rollers
-
Metal Detector/Rework Rejection Conveyor, rollers
-
Sepal Conveyors, Carriage Belt 1, rollers, scrapers, catch trays
-
Sig 1 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Off Totes/Stands - inspect underside of flaps and inside of stands
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
Box Incline Conveyor to Merge
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 2
-
Sepal Conveyors and bar aligner between lines 1 and 2
-
Carriage Belt 2, rollers, scrapers, catch trays
-
Sig 2 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Offs - Totes and inside of guards where bars hit
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
Box Incline Conveyor to Merge
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 3
-
Sepal Conveyors and bar aligner between lines 2 and 3
-
Carriage Belt 3, rollers, scrapers, catch trays
-
Sepal Conveyors after line 3 - re-feed belt, Bar aligner, bar accumulator, rollers, catch trays
-
Sig 3 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Offs - Totes and inside of guards where bars hit
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Box Incline Conveyor to Merge
-
Vision System Reject Cage Empty - By QC
-
Vision System Set up for Next Order - By QC
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Conveyors After Merge
-
Box Blow Off totes - Inside, Floor
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Blue Recycling Totes Emptied
-
Empty Case Conveyors
-
SLS - Inside, On Top, Floor, Stairs/Platforms
-
Robots - Inside, On Top, Floor
-
Filled Case Conveyors, Floor
-
Case Closers (2) - Inside, On Top, Floor
-
Case Labeler 1 and 2 Set Up for Next Order - By QC
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Production Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Pouch TNA
-
Wash Bay 3 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Dumper
-
Dumper Hopper
-
Incline Conveyor, rollers, support structure
-
Top Hopper (after incline conveyor) and Dust Collector
-
Vibrating Conveyor, mezzanine floor, stairs
-
TNA Buckets and slides
-
TNA Cone
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Laser Dater Set Up for Next Order
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Former - Inside, On Top, Floor, box tote
-
Blue Recycling Tote Emptied
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Picker - Inside, On Top Floor
-
WIP Station Clear - table, totes
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Box Conveyor from Picker to Line Scale
-
Box WIP Table by Line Scale
-
Line Scale Cleared and on Correct Program
-
Reject Bin at Line Scale - Inside, Floor
-
Triliner - Inside, On Top, Floor, WIP Totes
-
Blue Recycling Totes Emptied
-
Box Laser Dater Set for Next Order
-
Reject Bins/Table After Triliner - Inside, Floor
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Empty Case Conveyors to Case Packing
-
Case Packing Conveyor
-
Case Closer - Inside, On Top, Floor
-
Case Conveyor to Palletizer
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Production Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Line Inspection 2
-
Add Line Inspection
Line Inspection
-
Click here to Select Production Line Being Inspected
Cracker Kitchen
-
Mixer - Inside, Outside, Inlets
-
Dough Dumper
-
Dough Trough
-
Guillotine - blade, guards, catch tray, conveyor, touch screen
-
Proofing Belt / Metal Detector Conveyor - rollers, guide rails, scraper, catch trays, floor
-
Laminator Hopper, rollers, floor
-
Trim Return Conveyor, rollers, scraper
-
Flour Type Correct for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Laminator
-
Laminator Hopper, rollers, floor
-
Laminator Conveyors, rollers, scrapers, support structure, floor, guards
-
Laminator Program Correct for Next Order
-
Gauge Rollers, guards, scrapers, catch trays, belts
-
Relaxing Belt, rollers, scrapers, air
-
Rotary Cutter, belt, guard, anvil, rollers
-
Trim Return Conveyor, rollers, scraper
-
Salter - hoppers, belt, catch tray
-
Panner Belt, rollers, scraper
-
Oven Entrance, Interior and Exit
-
Oven Settings Correct for Next Order
-
Oil Type Correct for Next Order
-
Incline Conveyor, rollers, scraper
-
Flat belt, 90° Conveyors (2), catch trays
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Capper Room
-
Decline Belt, rollers, catch trays
-
Rotodex Infeed Slides
-
Capper Box - belt, guards, scraper, operator controls
-
Cream Heads
-
Capper Heads
-
Spiral Infeed Conveyor, guards, rollers, scraper, catch trays, floor
-
Spiral Entrance
-
Spiral Room - conveyor, walls, ceiling, floor
-
Belt 3 (along wall from capper) - rollers, catch trays, floor
-
Cream Mixer 1 - piping, pump, filter at flow plate
-
Cream Mixer 2 - piping, pump, filter at flow plate
-
Cream Holding Tank 2 - piping, pump, floor
-
Cream Holding Tank 3 - piping, pump, floor
-
Wash Bay 2 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Cracker TNA
-
Belt 5 Outfeed Conveyor - inside, rollers, floor
-
Tumbler Replacement Conveyor - inside, rollers, floor
-
Accumulator
-
Ceiling vents and ceiling tiles above cracker mezzanine - clean, in place, ceiling tiles seated correctly
-
Incline after Accumulator - inside, rollers, floor, inside motor guarding
-
Vibrating Conveyor After Accumulator, screen, dust collector
-
TNA Cone
-
TNA Buckets
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s) - WIP Station, totes
-
Blue Recycling Totes Emptied
-
Box Former - Inside, On Top, Floor
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Spiral Exit Belt, rollers, scraper, floor
-
Belt 3 - Along Wall from Capper, scraper, floor
-
Belt 5, rollers, covers, floor
-
Case Packer Infeed Conveyors
-
Box Blow Off Totes - Inside, Under
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Empty Case Conveyors
-
Case Packer - Inside, On Top, Floor
-
Case Labeler Set Up for Next Order
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Blue Recycling Totes Emptied
-
Case Wedge Conveyor and Conveyors to Palletizer
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Palletizer Stairs
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Cracker Boxing
-
WIP Station Clear - totes, floor
-
LJ Picker - Inside, On Top, Floor
-
Triliner - Inside, On Top, Floor
-
Blue Recycling Totes Emptied
-
Reject Bins/Table After Triliner - Inside, Floor
-
Laser Dater Set Up for Next Order
-
Operator Work Table(s)
-
Metal Detector Reject Cage Empty - By QC
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Productyion Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Granola Kitchen
-
Mixer - Inside, Outside, Inlets, Butterfly Valve
-
Chunker
-
Incline Conveyor (giraffe)
-
Conbar - hopper, rollers, scraper, catch tray, oil system
-
Inclusion Dispenser(s)
-
Rake(s)
-
1st Compaction Roller, scraper, catch tray
-
2nd Compaction Roller, scraper, catch tray
-
Woody, guard, pipes, hoses
-
Melter 1, pipes, pump
-
Holding Kettle 1, pipes, pump
-
Melter , pipes, pump
-
Holding Kettle 2, pipes, pump
-
Wash Bay 1 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Cooling Tunnel 1 - belt, doors, handles, rollers<br>Open all doors and inspect with a flashlight
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Guillotine
-
Steamer at cooling tunnel 1 and catch tray
-
Slicer - guard, anvil
-
Trim reject conveyor and UHMW slide
-
Spreader Cart, scraper, catch trays
-
Guillotine - blade, anvil, guards, catch tray, conveyor, touch screen
-
Enrober
-
Holding Tanks, pipes, pumps
-
Guillotine Melter
-
Enrober Replacement Conveyor, scraper, catch tray
-
Steamer at cooling tunnel 2 and catch tray
-
Cooling Tunnel 2 - belt, doors, handles, rollers<br>Open all doors and inspect with a flashlight
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 1
-
DFR (trombone) Conveyors - guards, rollers, scrapers, bar aligners, catch trays
-
Metal Detector - Inside, outside, conveyor, bar aligner, rollers
-
Metal Detector/Rework Rejection Conveyor, rollers
-
Sepal Conveyors, Carriage Belt 1, rollers, scrapers, catch trays
-
Sig 1 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Off Totes/Stands - inspect underside of flaps and inside of stands
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
Box Incline Conveyor to Merge
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 2
-
Sepal Conveyors and bar aligner between lines 1 and 2
-
Carriage Belt 2, rollers, scrapers, catch trays
-
Sig 2 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Offs - Totes and inside of guards where bars hit
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
Box Incline Conveyor to Merge
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 3
-
Sepal Conveyors and bar aligner between lines 2 and 3
-
Carriage Belt 3, rollers, scrapers, catch trays
-
Sepal Conveyors after line 3 - re-feed belt, Bar aligner, bar accumulator, rollers, catch trays
-
Sig 3 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Offs - Totes and inside of guards where bars hit
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Box Incline Conveyor to Merge
-
Vision System Reject Cage Empty - By QC
-
Vision System Set up for Next Order - By QC
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Conveyors After Merge
-
Box Blow Off totes - Inside, Floor
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Blue Recycling Totes Emptied
-
Empty Case Conveyors
-
SLS - Inside, On Top, Floor, Stairs/Platforms
-
Robots - Inside, On Top, Floor
-
Filled Case Conveyors, Floor
-
Case Closers (2) - Inside, On Top, Floor
-
Case Labeler 1 and 2 Set Up for Next Order - By QC
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Production Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Pouch TNA
-
Wash Bay 3 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Dumper
-
Dumper Hopper
-
Incline Conveyor, rollers, support structure
-
Top Hopper (after incline conveyor) and Dust Collector
-
Vibrating Conveyor, mezzanine floor, stairs
-
TNA Buckets and slides
-
TNA Cone
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Laser Dater Set Up for Next Order
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Former - Inside, On Top, Floor, box tote
-
Blue Recycling Tote Emptied
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Picker - Inside, On Top Floor
-
WIP Station Clear - table, totes
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Box Conveyor from Picker to Line Scale
-
Box WIP Table by Line Scale
-
Line Scale Cleared and on Correct Program
-
Reject Bin at Line Scale - Inside, Floor
-
Triliner - Inside, On Top, Floor, WIP Totes
-
Blue Recycling Totes Emptied
-
Box Laser Dater Set for Next Order
-
Reject Bins/Table After Triliner - Inside, Floor
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Empty Case Conveyors to Case Packing
-
Case Packing Conveyor
-
Case Closer - Inside, On Top, Floor
-
Case Conveyor to Palletizer
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Production Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Line Inspection 3
-
Add Line Inspection
Line Inspection
-
Click here to Select Production Line Being Inspected
Cracker Kitchen
-
Mixer - Inside, Outside, Inlets
-
Dough Dumper
-
Dough Trough
-
Guillotine - blade, guards, catch tray, conveyor, touch screen
-
Proofing Belt / Metal Detector Conveyor - rollers, guide rails, scraper, catch trays, floor
-
Laminator Hopper, rollers, floor
-
Trim Return Conveyor, rollers, scraper
-
Flour Type Correct for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Laminator
-
Laminator Hopper, rollers, floor
-
Laminator Conveyors, rollers, scrapers, support structure, floor, guards
-
Laminator Program Correct for Next Order
-
Gauge Rollers, guards, scrapers, catch trays, belts
-
Relaxing Belt, rollers, scrapers, air
-
Rotary Cutter, belt, guard, anvil, rollers
-
Trim Return Conveyor, rollers, scraper
-
Salter - hoppers, belt, catch tray
-
Panner Belt, rollers, scraper
-
Oven Entrance, Interior and Exit
-
Oven Settings Correct for Next Order
-
Oil Type Correct for Next Order
-
Incline Conveyor, rollers, scraper
-
Flat belt, 90° Conveyors (2), catch trays
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Capper Room
-
Decline Belt, rollers, catch trays
-
Rotodex Infeed Slides
-
Capper Box - belt, guards, scraper, operator controls
-
Cream Heads
-
Capper Heads
-
Spiral Infeed Conveyor, guards, rollers, scraper, catch trays, floor
-
Spiral Entrance
-
Spiral Room - conveyor, walls, ceiling, floor
-
Belt 3 (along wall from capper) - rollers, catch trays, floor
-
Cream Mixer 1 - piping, pump, filter at flow plate
-
Cream Mixer 2 - piping, pump, filter at flow plate
-
Cream Holding Tank 2 - piping, pump, floor
-
Cream Holding Tank 3 - piping, pump, floor
-
Wash Bay 2 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Cracker TNA
-
Belt 5 Outfeed Conveyor - inside, rollers, floor
-
Tumbler Replacement Conveyor - inside, rollers, floor
-
Accumulator
-
Ceiling vents and ceiling tiles above cracker mezzanine - clean, in place, ceiling tiles seated correctly
-
Incline after Accumulator - inside, rollers, floor, inside motor guarding
-
Vibrating Conveyor After Accumulator, screen, dust collector
-
TNA Cone
-
TNA Buckets
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s) - WIP Station, totes
-
Blue Recycling Totes Emptied
-
Box Former - Inside, On Top, Floor
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Spiral Exit Belt, rollers, scraper, floor
-
Belt 3 - Along Wall from Capper, scraper, floor
-
Belt 5, rollers, covers, floor
-
Case Packer Infeed Conveyors
-
Box Blow Off Totes - Inside, Under
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Empty Case Conveyors
-
Case Packer - Inside, On Top, Floor
-
Case Labeler Set Up for Next Order
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Blue Recycling Totes Emptied
-
Case Wedge Conveyor and Conveyors to Palletizer
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Palletizer Stairs
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Cracker Boxing
-
WIP Station Clear - totes, floor
-
LJ Picker - Inside, On Top, Floor
-
Triliner - Inside, On Top, Floor
-
Blue Recycling Totes Emptied
-
Reject Bins/Table After Triliner - Inside, Floor
-
Laser Dater Set Up for Next Order
-
Operator Work Table(s)
-
Metal Detector Reject Cage Empty - By QC
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Productyion Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Granola Kitchen
-
Mixer - Inside, Outside, Inlets, Butterfly Valve
-
Chunker
-
Incline Conveyor (giraffe)
-
Conbar - hopper, rollers, scraper, catch tray, oil system
-
Inclusion Dispenser(s)
-
Rake(s)
-
1st Compaction Roller, scraper, catch tray
-
2nd Compaction Roller, scraper, catch tray
-
Woody, guard, pipes, hoses
-
Melter 1, pipes, pump
-
Holding Kettle 1, pipes, pump
-
Melter , pipes, pump
-
Holding Kettle 2, pipes, pump
-
Wash Bay 1 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Cooling Tunnel 1 - belt, doors, handles, rollers<br>Open all doors and inspect with a flashlight
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Guillotine
-
Steamer at cooling tunnel 1 and catch tray
-
Slicer - guard, anvil
-
Trim reject conveyor and UHMW slide
-
Spreader Cart, scraper, catch trays
-
Guillotine - blade, anvil, guards, catch tray, conveyor, touch screen
-
Enrober
-
Holding Tanks, pipes, pumps
-
Guillotine Melter
-
Enrober Replacement Conveyor, scraper, catch tray
-
Steamer at cooling tunnel 2 and catch tray
-
Cooling Tunnel 2 - belt, doors, handles, rollers<br>Open all doors and inspect with a flashlight
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Ingredients from Previous Order Wrapped, Labeled and in Designated Return Area
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 1
-
DFR (trombone) Conveyors - guards, rollers, scrapers, bar aligners, catch trays
-
Metal Detector - Inside, outside, conveyor, bar aligner, rollers
-
Metal Detector/Rework Rejection Conveyor, rollers
-
Sepal Conveyors, Carriage Belt 1, rollers, scrapers, catch trays
-
Sig 1 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Off Totes/Stands - inspect underside of flaps and inside of stands
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
Box Incline Conveyor to Merge
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 2
-
Sepal Conveyors and bar aligner between lines 1 and 2
-
Carriage Belt 2, rollers, scrapers, catch trays
-
Sig 2 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Offs - Totes and inside of guards where bars hit
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Vision System Reject Cage Empty - By QC
-
Vision System Set Up for Next Order - By QC
-
Box Incline Conveyor to Merge
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Sig 3
-
Sepal Conveyors and bar aligner between lines 2 and 3
-
Carriage Belt 3, rollers, scrapers, catch trays
-
Sepal Conveyors after line 3 - re-feed belt, Bar aligner, bar accumulator, rollers, catch trays
-
Sig 3 infeed conveyors, touch screens, rollers, scrapers, lugs (pins), guards, guard handles, catch trays
-
Unwrapped Bar Blow Offs - Totes and inside of guards where bars hit
-
Wrapped Bar Reject Box
-
X-Ray - Inside, On Top, Floor
-
X-Ray Reject Bins - Emptied by QC
-
Reject/WIP Boxes After X-Ray
-
Demaurex Buckets, Boxes, Support Structure, Floor
-
Line Scale Cleared and Set to Correct Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Blue Recycling Totes Emptied
-
Triliner - Inside, On Top, Floor
-
Reject Bins-Table After Triliner - Inside, Floor
-
Box Incline Conveyor to Merge
-
Vision System Reject Cage Empty - By QC
-
Vision System Set up for Next Order - By QC
-
Box Former - Inside, On Top, Floor, Blue Recycling Tote Empited
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Laser Dater Set for Next Work Order
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Film Laser Dater Set for Next Work Order
-
Rework from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Conveyors After Merge
-
Box Blow Off totes - Inside, Floor
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Blue Recycling Totes Emptied
-
Empty Case Conveyors
-
SLS - Inside, On Top, Floor, Stairs/Platforms
-
Robots - Inside, On Top, Floor
-
Filled Case Conveyors, Floor
-
Case Closers (2) - Inside, On Top, Floor
-
Case Labeler 1 and 2 Set Up for Next Order - By QC
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Production Representative - By signing, you are confirming that the line is acceptable to begin production
-
QC Representative - By signing, you are confirming that the line is acceptable to begin production
Pouch TNA
-
Wash Bay 3 - hoses not touching floor, sink clean/clear, food contact items separated from non food contact items, brooms, mops, squeegees, mop buckets properly stored
-
Dumper
-
Dumper Hopper
-
Incline Conveyor, rollers, support structure
-
Top Hopper (after incline conveyor) and Dust Collector
-
Vibrating Conveyor, mezzanine floor, stairs
-
TNA Buckets and slides
-
TNA Cone
-
Film from Previous Order Wrapped, Labeled and in Designated Return Area
-
Laser Dater Set Up for Next Order
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
Box Former - Inside, On Top, Floor, box tote
-
Blue Recycling Tote Emptied
-
Boxes from Previous Order Wrapped, Labeled and in Designated Return Area
-
Picker - Inside, On Top Floor
-
WIP Station Clear - table, totes
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Casing
-
Box Conveyor from Picker to Line Scale
-
Box WIP Table by Line Scale
-
Line Scale Cleared and on Correct Program
-
Reject Bin at Line Scale - Inside, Floor
-
Triliner - Inside, On Top, Floor, WIP Totes
-
Blue Recycling Totes Emptied
-
Box Laser Dater Set for Next Order
-
Reject Bins/Table After Triliner - Inside, Floor
-
Case Former (Wexxar) - Inside, On Top, Floor
-
Empty Case Conveyors to Case Packing
-
Case Packing Conveyor
-
Case Closer - Inside, On Top, Floor
-
Case Conveyor to Palletizer
-
All Rolls of Preprinted Labels from Previous Order Removed
-
Palletizer - Inside, Under Turn Table, Floor, Surrounding Area
-
Correct Pallets in Palletizer for Next Order
-
Computer Work Station - Tools, iPad, Radio, Table Scale
-
Operator Work Table(s)
-
Cases from Previous Order Wrapped, Labeled and in Designated Return Area
-
Finished Product from Previous Order Wrapped, Labeled and in Designated Return Area
-
WIP from Previous Order Wrapped, Labeled and in Designated Return Area
-
GMPs in compliance with Food Safety Standards
-
6S in compliance with Leclerc Standards
Overall Evaluation of Line
-
Rate the overall readiness/cleanliness of the production line.
-
Sanitation Representative - By signing, you are confirming that the line is acceptable to begin production
-
Production Representative - By signing, you are confirming that the line is acceptable to begin production
-