Title Page

  • Site conducted

  • Date:

  • Program:

  • Select station to audit

  • Select Station to audit

  • Auditor Name

  • Shift:

  • Operator:

  • Warehouse - MGT SF 092-2 LPA Form Rev 0 content 10/11/18

  • PRIDE Board: Verify that all posted alerts (Process Change Notice, Quality Alerts, Safety Alerts, and Material Alerts) are not outdated.

  • -Verify the Safety, Quality, Timing, Cost, and Morale metrics have been updated within the past 24 working hours

  • -Are all master and secondary documents controlled with a form number?

  • -Do all communication documents have a document name, initiator name and date?

  • -Verify the current days start-up controls for that line (Run Rabbit, Equipment Start-Up Check Lists) were completed by start of shift. Check at a minimum one hard copy or electronic copy of equipment checklist are complete and accessible. Dock Locks? PM's?

  • -If a noted failure was found in start-up controls, verify that a reaction procedure was followed

  • Verify there is a documented CWI (Cleaning Work Instruction) and that the pucks are being followed according to the process.

  • -Verify the Team Member knows where the Standard Operation Sheet and Job Element Sheet are located.

  • -Verify appropriate PPE is called out on the SOS and is being worn. (safety glasses, belt covers, watch covers, aprons per plant specifications).

  • -Verify the SOS/JES and any unexpired alerts are being followed by each Team Member according to all chronological job elements (including any ergo or safety procedures/requirements).

  • Verify the Driver is following the Equipment Key & Radio Process.

  • -Verify the Team Member knows the part non-conforming process.

  • -Verify the Team Member knows the stacking heights guidelines and where to find them

  • Are the team members following the Receiving work instructions required by the Materials Department.

  • -If any PCN or Quality Alert exists for this operation, verify the operator is aware and following the documented change. (operator should be able to recite QA or PCN)

  • Verify any non-conforming parts have been identified/dispositioned/mutilated

  • Verify (1) Part in Pallet Decking matches location in Blackhawk.

  • -Review at least 1 part that is 100% FIFO. Validate Sticker matches FIFO schedule or Blackhawk

  • -High Risk - Verify the Team Member in the work cell is green in the OJT system.

  • If run rabbits are required for the workcell, verify that the operator who completed the rabbit is green in the OJT.

  • Review OJT and ensure all present Team Members are signed off on all opened alerts.

  • Are exterior doors / overhead doors following the sight security guidelines (doors not proped open, overhead doors power shut off, etc)

  • -Verify all returned racks are empty and check the racks for damage

  • -Does the team member understand how to identify a clean drum versus a soiled drum? <br>(Refer to QA below)

  • If you completed this audit on a shared device/tablet, please sign out of the device once you complete this audit.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.