Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Daily Task
-
A) Daily Rounds Complete
-
B) Check All Equipment
-
C) Monitor Utility Power per Contract
-
D) General Cleanup Complete
2. Operations
-
A) Continue to monitor power supply and electrical systems per contract.
-
B) Assist TGGT per Request
3. Maintenance
-
A) General Cleanup
-
B) Inspect and Change Filters for UPS and A/C as needed.
-
C) Inspect All Fire Extinguishers for Discharge or Tampering on a Monthly Basis
-
D) Inspect Smoke and Gas Detectors in the Generator Building and MCC Room.
-
E) G1/G2 Pre-Lube and Barring
4. Incident Reporting
-
A) Any Incidents to Report?
5. Inspections and Visits
-
A) Inspections?
-
B) Visits?
6. Scheduled Events
-
A) Monitor Electrical Systems
-
B) Shipment For Surplus Material
-
C) Other
Additional Comments
-
Signature - State Group Representative
-
Signature - Buttcon Energy Representative