Title Page
-
Project Name
-
Region
- Yellow
- Green
- Grey
- Orange
-
Client
-
Team (Name of Supervisor)
-
Inspector’s Name
-
Location
-
Date
-
Inspection Type
Site Safety Inspection Checklist
-
INSTRUCTIONS
----------------------
1. Please answer all the questions below.
2. Add photos and notes by clicking on the paperclip icon
3. To add a Corrective Action click on the paperclip icon then "Add Action," provide a description, assign to a member, set priority, and due date
4. Complete audit by providing digital signature
5. Share your report by exporting as PDF, Word, Excel or Web Link
Welfare Facilities
-
Proprietary Welfare facilities compliant to CDM Regs 2015 on site.
Site Documentation
-
Site Documentation – RAMS, COSHH assessments, CPP
-
Esite set up including inductions, training records etc
Site / Welfare / Compound / Storage
-
Standard of housekeeping adequate?
-
Nearest Hospital Details Available
-
First Aid Box, Eye wash & Burns kit
-
Fire Extinguisher(s) available and serviced within the last 12 months
-
Barriers / Demark around welfare compound
-
Smoking area / Mobile phone area
-
Waste Skip(s) available with correct signage (no COSHH)
-
Storage container in use
-
Drip trays / Plant Nappies & Spill kits
-
Gas Cage(s)
Signage
-
Signage in place for high risk activities/areas (Confined space entry, excavations etc)
Task Specific Inspection Checklist
Site permits in place and operational
-
Working in or near open water
-
To lift
-
Confined Space
-
To Dig
-
Working at Height
-
Hot Works
-
Isolation Permit
-
Client Permit
Excavations
-
CAT & Genny scans completed
-
What CAT & Genny equipment is in use (minimum spec is eCAT4+)
-
Soils away from excavation (Minimum measurement: depth = distance from the excavation edge)
-
Excavation battered back / stepped (depth exceeds 1.2m or subject to ground conditions)
-
Trench box / Shoring
-
Excavation daily inspection completed on Esite
-
Signage / Barriers guarding excavation
Task Specific Inspection Checklist
Scaffolding Fixed / Alloy Tower
-
Scaff tag / Inspect records / Handover
-
Have PASMA towers been erected by a competent person
-
PASMA Stabilisers deployed
-
PASMA Wheels locked
Confined Space Entry
-
Confined space safety equipment operational (escape sets, GDU, head torches etc)
-
What method of communication are the site team using i.e., radio or verbal
-
Is there sufficient demarcation at the entry control point
-
Harnesses tagged and in date
-
Does the entry controller have a harness and fall arrest equipment
-
Stretcher and Rescue Plan
-
Tripod & Winch certification
-
Water Space Hygiene Equip
Plant & Work Equipment
-
Is all plant and equipment on site uploaded onto Esite including relevant maintenance records
-
Daily Inspections on plant and equipment in use
-
HAVs Records / Vibrational Values
Lifting Operations
-
Lifting Plan
-
Signaller / Slinger Appointed / banks man
Demolition
-
Demo Plan
-
Ensure stability of structure(s)
-
Disconnection of services Isolation
Completion
-
Site Inspection Signed Off By : (Name & Signature)