Information
-
Client / Site
-
Audit Title
-
House Number
-
Conducted on
-
Prepared by
-
Location
Refurb Details
SITE INFORMATION
-
Manager
-
Area Manager
-
MID
PROPOSED DATES
-
Start
-
Practical Completion / Install
-
Hand Over
-
1st Dry Run
-
Go-Live
SITE PLAN / LAYOUT
-
Add drawing
-
Add media
Equipment
TILLS
-
Number of tills?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- gprs
-
What is site's current switch status
-
Tills
-
Back Office/Comms Cab
-
Number of printers?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- gprs
-
Add media
-
Do they have Cash Drawer sleeves?
PDQ's
-
Number of PDQ's
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- gprs
-
Number of Telephone lines?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- gprs
-
Add media
Wi-Fi
-
Who is the current Wi-Fi supplier?
-
Are they being upgraded to My Smart
-
Make sure The Cloud is cancelled if new RTS Wi-Fi solution is to be installed. An email with the sites name, address & postcode is to be sent to "GroupAdmin@Sky.uk" requesting service cancellation.
-
Location
-
Add media
KP / KMS
-
KP / KMS
-
What port on the Z500 controls the KP?
-
Add media
-
Is site upgrading to KMS?
PHONES
-
What type of phone system does site have?
-
Are they being upgraded to VoIP?
-
Info
-
Add media
-
Is there a phone location that might be affected by works?
-
Details
Proposed Works
PROPOSED WORKS
-
Till Type
-
Upgrade tills?
-
Tills need to be upgraded to TEC A20 model.
-
Server Model
-
Upgrade Server?
-
POSPC Server is to be upgraded to NUC
-
BOH Workstation Model
-
Upgrade Workstation?
-
BOH Workstation is to be upgraded to DELL 3020 mini.
-
LAN Switch Model
-
Upgrade Switch?
-
New D-Link LAN managed switch to be configured by RTS and installed by nGeneration
-
Are they having a Name / Brand change?
-
What will the new brand be?
- Slug & Lettuce
- Classic Inns
- Great Trad
- Proper Pub
- TP & K
- Missoula
- Montana B & G
- Common Room
- New Yates
- Popworld
-
Do they need their WiFi landing page changed?
-
Phone divert required?
-
Number?
-
Webmail Access Required?
-
Do they require any Till/IT works by STONEGATE?
-
Works requested
-
Add drawing
-
Add media
-
Do they require any Till/IT works by Celestra
-
Works requested
-
Add media
-
1st Fix
-
2nd Fix
-
Is a Podium required?
-
Do they require any works by Panama (RTS)
-
Works requested
-
Hybrid Wi-Fi?
-
New installation Required?
-
Estimated number of visits required?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- gprs
-
Details of visits required
-
Existing modification?
-
Estimated number of visits required?
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- gprs
-
Telephony?
-
Estimated number of visits
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- gprs
-
1st Fix
-
2nd Fix
-
Is a Podium required?
-
Contractor:
-
Foreman:
-
Access Time (Start)
-
Access Time (Finish):
-
Manager bagging tills or de-installing?
KIT REQUIREMENTS
-
Do they require silver standard patch leads?
-
Are there additional kit requirements from Celestra?
-
Kit Required
-
Engineer required at PC/Handover?