Information
-
Viscore ID:
-
Work Track No
-
Address
-
Prepared by:
-
Company Name
-
Enter Name of both scopers
-
Select date
ROW Scope Check List & Decision Tree
-
Connection Type
-
Clearly mention all Unit addresses
-
Clearly mention Unit addresses of Lots to Reticulate
-
Type of Network: ABF, fixed fibre or aerially?
-
Prove duct from the nearest BDD pit/manhole to boundary drop off, identify if it is not useable and the reason. Take pictures for record. NOTE: If the duct is not available up to the boundary, put details in “Extensive outside boundary work required” section. Where is the FAT/cabinet located? Distance from FAT or cabinet.
-
Take photo of servicing FAT or cabinet.
-
Is the POLE safe to climb?
-
Type of Pole
-
Explanatory notes identifying the condition of the pole and reasons for the pole to be unsafe.
-
Take photo of servicing OFDC or junction box.
-
Capture pole ID and where aerial feed is connected to.
-
Terminal installation required? (e.g IFDB. OFDCs, RATs etc)
-
Type of terminal? (e.g IFDB. OFDCs, RATs etc)
-
Aerial copper/fibre route available for EUPs in ROW/MDU?
-
Add media
Scoping Details
-
NETMAP/other plans available in job pack identifying existing network?
-
Network services available on site as per plans?
-
Take photo(s) of drop off clearly showing number of tubes & location relative to ROW landmarks.
-
Takes photos as required for possible drop off options, provide frontage & reinstatement measurements to consider new drop off lateral.
-
Step by step description of build. Format x-y, activity, distance, infrastructure; e.g. 1-2, T in grass 5m, 3xR Key: H -haul; SM – Surface mount; MT - microtrench; T - trench; LL - lift & lay; R - ruggedized; D - duct; FF - Fixed Fibre; G – Grass; GD – Garden; CS – Cobbles; S – Seal; C - concrete
-
Soft surface trenching
-
Total length of soft surface trenching
-
Hard Surface Trenching
- Seal
- Concrete
- Aggregate Concrete
- Stamped Concrete
- Bricks/Cobbles
-
Total length of hard surface trenching (Seal)
-
Total length of hard surface trenching (Concrete)
-
Total length of hard surface trenching (Agrigate Concrete)
-
Total length of hard surface trenching (Stamped Concrete)
-
Total length of hard surface trenching (Bricks/Cobbles)
-
Drilling/thrusting required
-
Total length of drilling/thrusting
-
Add Aerial view for planned work
-
Add photos for design. Blue - existing; Red - build; Purple - future or for provisioning.
-
Other requirements? I.e TMP, Arborist, WE Pole
- No
- L2 TMP
- Arborist
- EWP
- WE Pole
-
Explain Why EWP is required?
-
Additional Notes
Customer Details
-
Customer or requester was available at the time of scope?
Health, Safety and Environmental Issues
-
Have existing utility corridors been considered using on site observations & plans as part of the scope?
-
Build work in close proximity to HV Electricity or HP gas equipment?
-
Working at heights?
-
Dogs on site?
-
Unprotected edge? e.g. Trench, depression or waterway
-
Enter further notes for HS&E risk elimination or mitigation, e.g chemicals or asbestos, confined spaces, gas detection requirements etc.