Information

  • Prepared by

  • Location / Stage

  • Site

  • Address

  • Conducted on

Subgrade Checklist

  • Level pegs at adequate intervals with TOK level marked?

  • Shape is in accordance with endorsed plans and FSL checked with string line / survey checked?

  • Proof roll passed with no soft spots?

  • Subgrade is free from oversize floaters (more than 75mm) and surface rock?

  • Subgrade is free from roots and other foreign / organic material?

  • All fill below road pavements has been compacted to 98% standard, and results presented to council?

  • Service and drainage trenches back filled with class 3 crushed rock and compacted satisfactorily?

  • Comments

Summary

  • Photos

  • Additional Comments

  • Council Representative Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.