Information
-
Conducted on:
-
Building Name:
-
Building Address:
-
Completed By:
Swing Stage Information
-
Swing Stage Size:
-
Number of Beams / Hoists:
-
Counterweights per Beam (# of 50lb plates):
Roof
-
Beams Free of Bends or Twists
-
Beam Lock Pins In Place
-
Suspension Lines Properly Attached to Beams
-
Beams and Counterweights Tied Back
-
Correct Counterweight Used
-
Engineered Anchors
-
Beam Support System Secure
-
Safety Lines
Work Platform
-
Platform Connections
-
Guardrails & Midrails
-
Decks
-
Lock Pins In Place
-
Within Safe Working Limit
Motor & Hoisting Equiment
-
Beam Spacing and Alignment
-
Cables Fed Through Correctly
-
Electrical Cord Free of Twists & Knots
-
Electrical Cord Knot Self Tightening & Secure
-
Ascending & Descending Controls
-
Secondary Safety Controls
-
Additional comments or observations
-
Additional Notes:
Notes
-
Note:
Signatures
-
I hereby certify that all information is accurate and that an actual inspection was conducted as per company policy.
-
Inspector's Printed Name & Signature
-
Worker's Printed Name & Signature
Worker:
-
Add signature