Title Page
-
Daily Inspection Checklist Report for month:
-
Doc No. T2-ELEC-F01
-
Site:
-
Conducted on
-
Prepared by
-
Location:
-
Personnel
Select Team
Saturday: Weekly Inspection Checklist
Location: Basement 1
-
Team A/B/C:
Basement 1
B1 Main Building North
-
Time
-
1) Flow sign
-
2) Downlight
-
3) Fluorescent lights
-
4) Telephone Booth
-
5) Power point
-
6) Exit light
-
7) Clock (+/- 2min)
-
REMARKS:
B1 Main Building South
-
Time
-
8) Flow sign
-
9) Downlight
-
10) Fluorescent lights
-
11) Telephone Booth
-
12) Power point
-
13) Exit light
-
14) Clock (+/- 2min)
Driveway Exit No. 1-2
-
Time
-
15) Fluorescent lights
-
16) Clock (+/- 2min)
-
17) CDM-TD light
-
18) Exit light
-
19) Power Point
-
20) Downlight
-
REMARKS:
Driveway Exit No. 3-4
-
Time
-
21) Fluorescent lights
-
22) Clock (+/- 2min)
-
23) CDM-TD light
-
24) Exit light
-
25) Power Point
-
26) Downlight
Toilets
-
Time
-
27) Fluorescent lights
-
28) Toilet light
-
29) CDM-R light
-
REMARKS:
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):