Title Page
-
Daily Inspection Checklist Report for month:
-
Doc No. T2-ELEC-F01
-
Site:
-
Conducted on
-
Prepared by
-
Location:
-
Personnel
Monday Select Team
Monday: Daily Inspection Checklist
Location: Departure Hall
-
Team A/B/C:
Location: Departure Roadway
-
Team A/B/C:
Departure Hall
DEPARTURE HALL
South Departure
-
Time
-
1) Downlight
-
2) Flow/Standing Sign
-
3) High ceiling light
-
4) Power point
-
5) Clock (+/- 2min)
-
6) Exit light
-
REMARKS:
North Departure
-
Time
-
7) Downlight
-
8) Flow/Standing Sign
-
9) High ceiling light
-
10) Power point
-
11) Clock (+/- 2min)
-
12) Exit light
-
REMARKS:
Check in Row 1-5
-
Time
-
13) Fluorescent lights
-
14) Flow/Standing Sign
-
15) Halogen Light
-
16) Daylight
-
17) Exit light
-
18) Telephone Light
-
19) Clock (+/- 2min)
-
20) Power point
-
21) Check in Row LED
-
REMARKS:
Check in Row 6-11
-
Time
-
22) Fluorescent lights
-
23) Flow/Standing Sign
-
24) Halogen Light
-
25) Daylight
-
26) Telephone Light
-
27) Power point
-
28) Clock (+/- 2min)
-
29) Exit light
-
30) Check in Row LED
-
REMARKS:
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):
Departure Roadway
DEPARTURE Roadway
Departure Roadway
-
Time
-
31) Spot lights
-
32) Power point
-
33) Entrance Signage 1-8
-
34) Clock (+/- 2min)
-
35) Exit light
-
REMARKS:
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):