Title Page
-
Daily Inspection Checklist Report for month:
-
Doc No. T2-ELEC-F01
-
Site:
-
Conducted on
-
Prepared by
-
Location:
-
Personnel
Select Team for Transit check
Transit Daily Inspection Checklist
Location: level 1&2 transit and level 1 Apron
-
Team A/B/C:
-
SHIFT:
Level 1& 2 Transit
LEVEL 2 TRANSIT
-
TIME:
-
Daylight Group 13 to 18 - F/Tube
-
TIME:
-
Flight of bird (near GHR B5) - Halogen bulb
-
TIME:
-
Glass Panel (in front GHR B7) - CDM-T
-
TIME:
-
Butterfly Garden - Planter Light
-
TIME:
-
Koi Pond Light - LED
-
TIME:
-
PMS North - CDM-T
-
TIME:
-
PMS South - CDM-T
-
TIME:
-
Sky Light SSP - CDM-T
-
TIME:
-
Smoking Room SSP - F/Tube
-
TIME:
-
Smoking Room M/B South - LED
Level 1 Transit
-
TIME:
-
Family Sculpture - LED
-
Remarks:
-
Action Taken:
-
Checked by:
-
Engie Technical Officer (Chandra):
-
Checked & Acknowledged by (CAG Officer: Kamaruzaman):