Title Page
-
Document No.
-
Inspection Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Fix-it schedule
DAILY SYSTEM CHECK - MECH
-
Daily System Check 2nd Shift
Daily Check - Pump & Tank
Daily System Check- Pump room & Tank
Equipment Description (1st Round)
-
Time:
-
1) Water Pump Room (B2 Main Building)
-
2) Ejector Pump Room (B2 Main Building)
-
3) Ejector Pump Room (B3 North Main Building)
-
4) Ejector Pump Room (B3 South Main Building)
-
Remarks:
Equipment Description (2nd Round)
-
Time:
-
1) Water Pump Room (B2 Main Building)
-
2) Ejector Pump Room (B2 Main Building)
-
3) Ejector Pump Room (B3 North Main Building)
-
4) Ejector Pump Room (B3 South Main Building)
-
Remarks:
Equipment Description (3rd Round)
-
Time:
-
1) Water Pump Room (B2 Main Building)
-
2) Ejector Pump Room (B2 Main Building)
-
3) Ejector Pump Room (B3 North Main Building)
-
4) Ejector Pump Room (B3 South Main Building)
-
Remarks:
Equipment Description (Vacuum Pump & Tank)
-
Time:
-
1) Toilet Vacuum Pump (L1 South Main Building)
-
2) Water Tank Domestic (B2 Apron)
-
3) Water Tank Industrial (B2 Apron)
-
Remarks:
-
Technician Sign:
-
Supervisor Acknowledged (CAG):