Title Page

  • Document No.

  • Inspection Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Fix-it schedule

DAILY SYSTEM CHECK - MECH

  • Daily System Check 2nd Shift

Daily Check - Pump & Tank

Daily System Check- Pump room & Tank

Equipment Description (1st Round)

  • Time:

  • 1) Water Pump Room (B2 Main Building)

  • 2) Ejector Pump Room (B2 Main Building)

  • 3) Ejector Pump Room (B3 North Main Building)

  • 4) Ejector Pump Room (B3 South Main Building)

  • Remarks:

Equipment Description (2nd Round)

  • Time:

  • 1) Water Pump Room (B2 Main Building)

  • 2) Ejector Pump Room (B2 Main Building)

  • 3) Ejector Pump Room (B3 North Main Building)

  • 4) Ejector Pump Room (B3 South Main Building)

  • Remarks:

Equipment Description (3rd Round)

  • Time:

  • 1) Water Pump Room (B2 Main Building)

  • 2) Ejector Pump Room (B2 Main Building)

  • 3) Ejector Pump Room (B3 North Main Building)

  • 4) Ejector Pump Room (B3 South Main Building)

  • Remarks:

Equipment Description (Vacuum Pump & Tank)

  • Time:

  • 1) Toilet Vacuum Pump (L1 South Main Building)

  • 2) Water Tank Domestic (B2 Apron)

  • 3) Water Tank Industrial (B2 Apron)

  • Remarks:

  • Technician Sign:

  • Supervisor Acknowledged (CAG):

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.