Address
-
Conducted on
-
TechSafe Australia Job Number
Solar Installation Details
TECHSAFE AUSTRALIA Overvoltage in a customer's installation caused by Alternative Energy Generation System.
-
TechSafe inspector
- Damian Grubb
- Grant Watkins
- Chris Broad
- Phillip Whitmore
- Tim Hopper
- David Lynch
- Graeme Loosmore
- Richard Tattersall
- Paul Jones
- Clayton Davies
- Martin Daniel
- Nigel Allen
I, the above mentioned, Electrical Inspector have become aware of a voltage above 253Vac, (230Vac + 10%) measured between Active and Earth and Active and Neutral and am obliged to disconnect or cause to be disconnected the source of electricity that is the cause of such excessive voltage. I have followed the below mentioned procedure.
Following a voltage measurement reading performed at any part of the installation that provides a result of a voltage above 253V, measured between Active and Earth and Active and Neutral, an Inspector needs to perform the following procedure:
-
CEC number:
-
Address of installation:
-
Installation details:
-
Brand and number of inverters installed
-
Total generation capacity of system
-
Voltage measurement:
-
Date and time measurement was taken:
-
Cloud coverage at the time of measurement:
After the cause of such over voltage was disconnected a 2nd measurement is to be conducted.
-
2nd Voltage measurement:
-
Date and time 2nd measurement was taken:
-
Cloud coverage at the time of 2nd measurement:
If the voltage is now below the maximum limit, Isolate the system with a danger tag.
-
Owner verbally notified:
-
Contractor verbally notified:
-
Tas networks Fault centre notified via telephone:
-
Date the above were notified:
-
Other relevant information
-
Add signature