Title Page
-
Conducted on
-
Prepared by
-
If no check required, please leave any comments under each checklist.
Before Every Shift check - Safety devices/Protective equipment
-
Lockable mains isolator switch
-
Emergency Stop button
-
Noise abatement enclosure
-
Safety hood with safety contact strip and safety switch
-
Guard door/maintenance door at rear with electrical interlock
-
Safety fences at rear
-
Test safety contact strip to DIN EN ISO 1356-2
Daily Checklist
-
Entire System - Rough cleaning after every shift, broom clean
-
Internal machine area - Clean swarf out of entire internal area of machine (Suction/sweeping or cloth to be used)
-
Clean profile face - Blow clean with compressed air
-
Gear racks - Suction cleaning, sweeping or wiping off swarf
-
Guide System - Suction cleaning, sweeping or wiping off swarf
-
Clamping cylinder - check seal integrity; check clamping buffer for signs of damage (make note if replacement is required)
-
Tools - Check for signs of wear and/or damage (make note if replacement is required)
-
Pneumatic lines and connections - Blow clean with compressed air or use lint-free cleaning cloths
-
Pneumatic maintenance unit (Water Separator) - Blow clean with compressed air or use lint-free cleaning cloths and check seal integrity/leakage; water separator: check fill level and drain if necessary
-
Electrical wiring and connections - Blow clean with compressed air or use lint-free cleaning cloths
-
Spray Unit, tool lubrication - Check fill level and refill if necessary
-
Pulsed Coolant System, gear rack lubrication - Check fill level and refill if necessary
-
Control consoles and air-cooled main electrical cabinets - Regularly inspect the air intake and outlet filters, clean if soiled (Replace if necessary)
-
Polycarbonate pane in safety hood - Visual inspection for damage (holes, cracks or clouding)
-
Machining spindle - Check if replacement is required (This has to be carried out by Elumatec staff, non-compliance causes the warranty to become void)
-
Any comments
Weekly Checklist
-
Entire System - Thorough clean
-
Guide System - Lubricate with machine oil
-
Linear Guide, X,Y & Z-axis - To be greased with Multi-purpose grease (Order no. 88907128)
-
Any comments
Monthly Checklist
-
Pneumatic Lines and connections - Visual inspection for cracks and porous areas, check that screw connections are securely seated and free of leakage
-
Electrical wiring and connections - Visual inspection for cracks and porous areas, check that screw connections are securely seated and free of leakage
-
Linear guide for material stop up/down - To lubricate use multi-purpose grease (order no.88907128)
-
Any comments
Yearly Checklist
-
Yearly service - Call out
-
Any comments