Title Page
-
Conducted on
-
Prepared by
-
If no check required, please leave any comments under each checklist.
Daily Checklist
-
Oil leakage from cylinders
-
Lubrication of tooling
-
Guards against any physical damage
-
Any comments
Weekly Checklist
-
Oil leakage in pipe, hoses and hydraulic elements
-
Hydraulic fluid level
-
Cylinder Connecting bolts for tightness
-
Safety & limit switches against loosening damage
-
Any comments
6 Monthly Checklist
-
Stop time control by specialist
-
Any comments
Yearly Checklist
-
Terminal connections of the electrical installation by electrician/service
-
Any comments