General Overview

  • Ducting & pits completed to plan

  • Signals hardware installed to plan

  • Loops installed and connected to plan

  • Controller installed and connected to power

  • Signal lanterns flashed out and OK

  • Controller connected to SCATS system

  • Controller operation checked onsite

  • Vehicle and pedestrian inputs tested

  • Footpaths, roadway and kerbs reinstated

  • Disused cables removed

  • Intersection left clean and tidy

  • Comments

Controller

  • Controller make noted

  • Controller Boards / Modules noted

  • LCM make and model noted

  • Modem make and model noted

  • VID make and model noted

  • VID MUX make and model noted

  • Switch make and model noted

  • Certificate of Test for modifications affixed

  • Accurate As Con plan available in controller

  • Multicore terminations tight

  • VID panel installed

  • Loop terminations tight

  • Loop feeders and cables numbered to UMS 600/021 notes 6 & 7

  • Linking connected

  • LCM installed

  • Connected to Optus ADSL

  • Connected to Optus 3G

  • Connected to BCC ADSL

  • Connected to Fibre

  • Screed available and matches plan

  • Action book available

  • LCB overlay reflects signal groups

  • Spare cores earthed

  • Communications surge diverter installed

  • A/T relay connected

  • Conduits sealed to UMS 600/033

  • Site plate fitted

  • Auxiliary power supplies installed

  • Additional circuit breakers installed

  • Comments

Hardware audit

  • Post 1 Lanterns<br><br>

  • Post 1 Sight Boards<br><br>

  • Post 1 Special Lenses - Type and Colour<br><br>

  • Post 1 Cowls<br><br>

  • Post 1 Louvres<br><br>

  • Post 1 Pushbutton and A/T<br><br>

  • Post 2 Lanterns<br><br>

  • Post 2 Sight Boards<br><br>

  • Post 2 Special Lenses - Type and Colour<br><br><br>

  • Post 2 Cowls<br><br>

  • Post 2 Louvres<br><br>

  • Post 2 Pushbutton and A/T<br><br>

  • Post 3 Lanterns<br><br>

  • Post 3 Sight Boards<br><br>

  • Post 3 Special Lenses - Type and Colour<br><br><br>

  • Post 3 Cowls<br><br>

  • Post 3 Louvres<br><br>

  • Post 3 Pushbutton and A/T<br><br>

  • Post 4 Lanterns<br><br>

  • Post 4 Sight Boards<br><br>

  • Post 4 Special Lenses - Type and Colour<br><br><br>

  • Post 4 Cowls<br><br>

  • Post 4 Louvres<br><br>

  • Post 4 Pushbutton and A/T<br><br>

  • Post 5 Lanterns<br><br>

  • Post 5 Sight Boards<br><br>

  • Post 5 Special Lenses - Type and Colour<br><br><br>

  • Post 5 Cowls<br><br>

  • Post 5 Louvres<br><br>

  • Post 5 Pushbutton and A/T<br><br>

  • Post 6 Lanterns<br><br>

  • Post 6 Sight Boards<br><br>

  • Post 6 Special Lenses - Type and Colour<br><br><br>

  • Post 6 Cowls<br><br>

  • Post 6 Louvres<br><br>

  • Post 6 Pushbutton and A/T<br><br>

  • Post 7 Lanterns<br><br>

  • Post 7 Sight Boards<br><br>

  • Post 7 Special Lenses - Type and Colour<br><br>

  • Post 7 Cowls<br><br>

  • Post 7 Louvres<br><br>

  • Post 7 Pushbutton and A/T<br><br>

  • Post 8 Lanterns<br><br>

  • Post 8 Sight Boards<br><br>

  • Post 8 Special Lenses - Type and Colour<br>

  • Post 8 Cowls<br><br>

  • Post 8 Louvres<br><br>

  • Post 8 Pushbutton and A/T<br><br>

  • Post 9 Lanterns<br><br>

  • Post 9 Sight Boards<br><br>

  • Post 9 Special Lenses - Type and Colour<br><br><br>

  • Post 9 Cowls<br><br>

  • Post 9 Louvres<br><br>

  • Post 9 Pushbutton and A/T<br><br>

  • Post 10 Lanterns<br><br>

  • Post 10 Sight Boards<br><br>

  • Post 10 Special Lenses - Type and Colour<br><br>

  • Post 10 Cowls<br><br>

  • Post 10 Louvres<br><br>

  • Post 10 Pushbutton and A/T<br><br>

  • Post 11 Lanterns<br><br>

  • Post 11 Sight Boards<br><br>

  • Post 11 Special Lenses - Type and Colour<br><br><br>

  • Post 11 Cowls<br><br>

  • Post 11 Louvres<br><br>

  • Post 11 Pushbutton and A/T<br><br>

  • Post 12 Lanterns<br><br>

  • Post 12 Sight Boards<br><br>

  • Post 12 Special Lenses - Type and Colour<br><br><br>

  • Post 12 Cowls<br><br>

  • Post 12 Louvres<br><br>

  • Post 12 Pushbutton and A/T<br><br>

  • Post 13 Lanterns<br><br>

  • Post 13 Sight Boards<br><br>

  • Post 13 Special Lenses - Type and Colour<br><br><br>

  • Post 13 Cowls<br><br>

  • Post 13 Louvres<br><br>

  • Post 13 Pushbutton and A/T<br><br>

  • Post 14 Lanterns<br><br>

  • Post 14 Sight Boards<br><br>

  • Post 14 Special Lenses - Type and Colour<br><br><br>

  • Post 14 Cowls<br><br>

  • Post 14 Louvres<br><br>

  • Post 14 Pushbutton and A/T<br><br>

  • Post 15 Lanterns<br><br>

  • Post 15 Sight Boards<br><br>

  • Post 15 Special Lenses - Type and Colour<br><br><br>

  • Post 15 Cowls<br><br>

  • Post 15 Louvres<br><br>

  • Post 15 Pushbutton and A/T<br><br>

  • Post 16 Lanterns<br><br>

  • Post 16 Sight Boards<br><br>

  • Post 16 Special Lenses - Type and Colour<br><br><br>

  • Post 16 Cowls<br><br>

  • Post 16 Louvres<br><br>

  • Post 16 Pushbutton and A/T<br><br>

Hardware installation

  • Post mounting to UMS 600/060

  • Post alignment as per construction plan

  • Joint use pole specification to UMS 600/052

  • Mast arm specification to UMS 600/053

  • Rate 2 earthing installed to UMS 600/052 and 600/053 & Energex PLCM page 1-2-833

  • Joint use poles numbered to Energex requirements

  • 2 sources of supply stickers affixed - UMS 600/050

  • Traffic signal termination enclosures on JU poles comply with UMS 600/041

  • Multicore terminations on posts comply with UMS 600/040 (finial) or 600/041 (fiscar)

  • Redundant holes in posts and enclosures plugged - AS/NZS:3000

  • Vehicle lantern mounting to UMS 600/050

  • Lock washers installed to UMS 600/046

  • Vehicle lanterns aligned to associated traffic lanes

  • Vehicle lanterns visible

  • Vehicle lantern cowls as per construction plan

  • Vehicle lantern cabling secured

  • Lantern doors closed

  • Ped lantern mounting to UMS 600/051

  • Ped lanterns aligned to associated crossings

  • Ped lanterns visible

  • Ped lantern cabling secured

  • Ped lantern doors closed

  • A/T driver mounting to UMS 600/051 (post) or 600/050 (JU)

  • A/T cabling secured

  • P/B mounting to UMS 600/051

  • P/B alignment to UMS 600/051

  • Ped/Cyclist stickers affixed to UMS 600/051

  • Comments

Civil

  • 75mm slab installed around controller base - UMS 600/033

  • Pit lids compliant with UMS 600/030 and fitted correctly

  • Electrical road crossings as per construction plan

  • Kerb ramps installed to UMS 216

  • Pole bases grouted to UMS 600/050 (JU) or 600/060 (post)

  • Post setback to UMS 600/060

  • JU pole setback to Energex Public Lighting Construction Manual

  • Landscaping completed

  • E markers installed to UMS 600/024

  • Electrical conduits at correct depths - UMS 600/024

  • Shallow conduit markers - UMS 600/024

  • Loops conduits at correct depth - UMS 600/026

  • Loops saw cut entry to UMS 600/020

  • Loops cut and sealed to UMS 600/021

  • Loop Lead-ins jointed and numbered to UMS 600/021

  • Loop locations as per construction plan

  • Line marking as per construction plan

  • Comments

Signal Operation

  • Vehicle lanterns flashed

  • Vehicle lanterns run

  • Ped lanterns flashed

  • Ped lanterns run

  • P/B inputs checked

  • P/B inputs driving correct group

  • Loop detectors checked

  • Loop inputs checked

  • Loop inputs driving correct group

  • A/T relay operational

  • A/T operation checked

  • Linking communicating

  • Comments

  • Auditor signature

  • Auditee signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.