Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Day 1 work

  • Is Work in progress

Electrical / Mechanical Installation

  • Hang SC control Panel<br>

  • Hang VAV transformers<br>

  • Wire RTU1, WCI, OA Building Static, fire alarm<br>

  • Wire RTU2, WCI, RA RH, fire alarm<br>

  • Install and / wire WCI 1 and 2<br>

  • Pull VAV 24vac power<br>

BAS Progress

  • Meet with EC install contractor and review install proces and priorities

  • Review iAuditor with PM

  • Address iAuditor findings with MC as necessary after talking with PM

  • Mount Controllers in panel.

  • Email progress to PM

Day 2 work

  • Is Work in progress

Electrical / Mechanical Installation

  • Pipe and pull wire Boilers/Pumps

  • Wire VAV's, Power, DAT, HWV, check WCI address, check all connections

  • complete blr room terminations

BAS Process

  • Get SC license installed in SC. Setup SC.

  • Program/Set Up RTU's

  • Program HW System UC-600

  • Work with Local office Start Up Tech on RTU's

  • Start working on graphics.

  • Start working on graphics.

  • Supervise EC install

  • Meet with MC regarding issues to complete for start up

Day 3 work

  • Is Work In progress

Electrical / Mechanical Installation

  • Install and wire router

  • Pull wire for Freezer Alarm

  • Pull wire for Freezer Temp

  • Wire UH Fan/control Valve

  • Install and Wire Garage Door contact

  • Wire EF

  • complete freezer temp termination

  • complete freezer alarm termination

  • install thermostats

  • Label Grid

BAS Progress

  • Program/Label Stats

  • Install VAV controllers into SC.

  • Place points out of service on VAV boxes and setup RTU controllers.

  • Work with local office start up tech on RTU's

  • Program ventilation set-points into all VAV boxes.

  • Work on graphics

  • Supervise EC Install

  • Email progress to PM

Day 4 Work

  • Is Work in progress

Electrical / Mechanical Installation

  • Everything done on day 1, 2, 3 or 4

  • assist with system check out

BAS Progress

  • Perform system checkout

  • Perform combustion analysis

  • Work on Alarming

  • Supervise EC on Boilers

Day 5 Work

  • Is Work in progress

Electrical / Mechanical Installation

  • Everything done on day 1, 2, 3 or 4

  • assist with system check out

BAS Progress

  • Completed Overview of system operation.

  • Email progress to PM

  • Has the As-Built's been Emailed to the PM

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.