Title Page

  • I-5 North Coast
    Trenching Pre- Construction Checklist

  • Prepared by

  • Conducted on

  • Location

Pre-construction Considerations

  • Have the construction supervisor & engineer completed an on site review before construction begins?<br>

  • Has Underground Service Alert been contacted? (Do you have a Dig Alert ticket?)<br>

  • Ticket Number:

  • Ticket

  • Have survey stake and elevation marks of the job site been set?<br>

  • Have the construction supervisor & crew leader completed a pre-construction meeting?<br>

  • Has a tailgate meeting between trenching and installation crew been completed?<br>

  • What is the depth of the groundwater table? (in Feet)

  • How Long will the trench be open? (in days)

  • Will the trench be near construction blasting?<br>

  • Will the trench require walkways designated for crossing?<br>

  • Will the trench be greater than 5’ deep?<br>

  • What is the expected shoring/protection method?

  • Please Specify:

  • Are there utilities underground?<br>

  • Specify Corrective Measures:

  • Are there utilities overhead?<br>

  • Specify Corrective Measures:

Job Site Review Checklist

  • Has a tailgate meeting with the crew been held?

Trench Dimensions

  • Max Depth:

  • Bottom Width:

  • Length:

  • Indicate Soil Type

  • Type A soil:

    Type A.PNG
  • Type B soil:

    Type B.PNG
  • Type C soil:

    Type C.gif
  • How was the soil type determined?

  • Is there less than 10% gravel (by weight) in the Soil?<br>

  • Select Type of Protection:

  • Hydraulic Shoring Systems Type:

  • UPRIGHT HEIGHT:

  • SPACING:

  • TIMBER WALE:

  • SIZE:

  • WALE LENGTH:

  • SPACING:

  • Please Specify:

  • Sheeting Required?

  • Sheeting Thickness/Type:

C. SPECIAL CONDITIONS

Utilities

  • Is power pole and/or adjacent structure bracing needed?

  • Is there a prior or existing excavation nearby?

  • Has the USA utility location been marked?

Sidewalks/Pedestrian Safety

  • Are lighted barricades needed?<br>

  • Is fencing in place?<br>

  • Is barricade tape in place?<br>

  • Is plating material in place?

Roadway Traffic Hazards

  • Is the area congested?<br>

  • Describe corrective measures:

  • Are Cones Needed?<br>

  • Are lighted barricades needed?

  • Are fluorescent orange vests needed?

  • Will there be lane or street closures?<br>

  • Is steel plated material needed?

  • Is a traffic control officer needed?

Tunneling Considerations

  • Is a bore pit required?<br>

  • Is shoring needed?<br><br>

  • Is bracing needed?

  • Are lighted barricades needed?

  • Is barricade tape needed?<br>

Procedures

  • Has emergency excavation mishap procedures been discussed with crew?<br><br>

  • Have procedure guidelines been checked?

Security Protection:

  • Is protection provided during weekends and evenings after crew has left site?<br><br>

  • Is barricading in place for roadway, sidewalks and excavations?<br>

  • Are steel plates provided for road crossing?<br>

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.