Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SCORE - 10
-
Is there evidence of Policy Deployment
SCORE - 9
-
Is there evidence of a plan to introduce Policy Deployment the Unipart Way
-
Does the plan clearly identify at which levels you plan to use PDM in next 12 months?<br><br>(this should include a Deployment plan showing linkages from Level 1 to lowest level applicable in the Business unit)
-
Has a repository of completed PDM's & traffic light reports been identified
-
Does plan include identification of Site SAE for PDM<br><br>(Level 3 is the min standard)
SCORE - 8
-
Have Business unit aims & results been set with input from level 0
-
Has an owner of the Business PDM been identified
-
Has PDM SAE been trained to Level 3 Unipart Way competency for PDM
SCORE - 7
-
Is there a Level 1 PDM
-
Is there evidence that the de selection process was used <br><br>(aim to have no more than 10 projects)
-
Are project owners identified for all projects
-
Are deliverables SMART: i.e. Specific, Measurable, Achievable, Relevant, Time Bound
-
Has the Exec team followed the standard Unipart Way Policy Deployment process
-
Is a controlled version of the Level 1 PDM available to the current standard
SCORE - 6
-
Are structured meetings taking place to review the Level 1 PDM
-
Is the frequency of the meetings at least monthly
-
Is there a traffic light / monitoring report available for the last month
-
Do owners or nominated deputies participate in review meetings
-
Can you demonstrate corrective actions are in place for off target performance
-
Can you demonstrate improving business performance through execution of PDM plan
SCORE - 5
-
Is there a Level 2 PDM
-
Is there evidence that the de selection process was used <br><br>(aim to have no more than 10 projects)
-
Are project owners identified for all projects
-
Are deliverables SMART: i.e. Specific, Measurable, Achievable, Relevant, Time bound
-
Is there evidence that Level 2 links to Level 1 where appropriate
-
Is a controlled version of the Level 2 PDM available to the current standard
-
Can you demonstrate improving business performance through execution of PDM plan
SCORE - 4
-
Are structured meetings taking place to review the Level 2 PDM