Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

SCORE - 10

  • Is there evidence of Policy Deployment

SCORE - 9

  • Is there evidence of a plan to introduce Policy Deployment the Unipart Way

  • Does the plan clearly identify at which levels you plan to use PDM in next 12 months?<br><br>(this should include a Deployment plan showing linkages from Level 1 to lowest level applicable in the Business unit)

  • Has a repository of completed PDM's & traffic light reports been identified

  • Does plan include identification of Site SAE for PDM<br><br>(Level 3 is the min standard)

SCORE - 8

  • Have Business unit aims & results been set with input from level 0

  • Has an owner of the Business PDM been identified

  • Has PDM SAE been trained to Level 3 Unipart Way competency for PDM

SCORE - 7

  • Is there a Level 1 PDM

  • Is there evidence that the de selection process was used <br><br>(aim to have no more than 10 projects)

  • Are project owners identified for all projects

  • Are deliverables SMART: i.e. Specific, Measurable, Achievable, Relevant, Time Bound

  • Has the Exec team followed the standard Unipart Way Policy Deployment process

  • Is a controlled version of the Level 1 PDM available to the current standard

SCORE - 6

  • Are structured meetings taking place to review the Level 1 PDM

  • Is the frequency of the meetings at least monthly

  • Is there a traffic light / monitoring report available for the last month

  • Do owners or nominated deputies participate in review meetings

  • Can you demonstrate corrective actions are in place for off target performance

  • Can you demonstrate improving business performance through execution of PDM plan

SCORE - 5

  • Is there a Level 2 PDM

  • Is there evidence that the de selection process was used <br><br>(aim to have no more than 10 projects)

  • Are project owners identified for all projects

  • Are deliverables SMART: i.e. Specific, Measurable, Achievable, Relevant, Time bound

  • Is there evidence that Level 2 links to Level 1 where appropriate

  • Is a controlled version of the Level 2 PDM available to the current standard

  • Can you demonstrate improving business performance through execution of PDM plan

SCORE - 4

  • Are structured meetings taking place to review the Level 2 PDM

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.