审计
A: Certificate and Documentation
-
Statutory and Class certificate fitted according to Form DCP-FM03
-
5 year service for life boat / rescue boat <br>launching devices<br>
-
5 year service for life boat on load release gear
-
Status of personnel certificates
-
PSC Inspection File
-
Class survey file
-
Check list carried out as mentioned on ISM
-
Drill record
-
Maintenance record of individual equipment
-
Muster list
-
Other manuals and documentations
-
Status of nautical publications, international <br>convention documentations & flag <br>administration publications<br>
B-1: First Impression (Outside Shell)
-
Ship’s bow
-
Top side
-
Boot top
-
Draft mark
-
Stern
-
Mooring condition
-
Accommodation ladder and safety net
-
Paint loss if found
-
Heavy pitting/corrosion if found
-
Gangway watch
-
Response from on duty officer/crew
B-2:Water ballast tanks
-
No 1 WBT( p’side )
-
No 1 WBT( s’side )
-
No 1 WBT(Center )
-
No 2 WBT( p’side )
-
No 2 WBT( s’side )
Superintendent's Comments : No. 1 WBT( p’side )
-
1. Forward watertight bulkhead
-
2. Aft watertight bulkhead
-
3. Side shell plating
-
4. Floor (tank slopping plate)
-
5. Upper plating (upper deck under)
-
6. Web frame, longitudinal stiffeners, brackets, face plate and carlings
-
7. Vertical ladder and step
-
8. Zinc anode
-
9. Air pipe, sounding pipe and extended spindles
-
10. Striking plate underneath sounding pipe, plating underneath bell mouth
No. 1 WBT( s’side )
-
1. Forward watertight bulkhead
-
2. Aft watertight bulkhead
-
3. Side shell plating
-
4. Floor (tank slopping plate)
-
5. Upper plating (upper deck under)
-
6. Web frame, longitudinal stiffeners, brackets, face plate and carlings
-
7. Vertical ladder and step
-
8. Zinc anode
-
9. Air pipe, sounding pipe and extended spindles
-
10. Striking plate underneath sounding pipe, plating underneath bell mouth
No. 2 WBT( p’side )
-
1. Forward watertight bulkhead
-
2. Aft watertight bulkhead
-
3. Side shell plating
-
4. Floor (tank slopping plate)
-
5. Upper plating (upper deck under)
-
6. Web frame, longitudinal stiffeners, brackets and face plate and carlings
-
7. Vertical ladder and step
-
8. Zinc anode
-
9. Air pipe, sounding pipe and extended spindles
-
10. Striking plate underneath sounding pipe, plating underneath bell mouth
No. 2 WBT( s’side )
-
1. Forward watertight bulkhead
-
2. Aft watertight bulkhead
-
3. Side shell plating
-
4. Floor (tank slopping plate)
-
5. Upper plating (upper deck under)
-
6. Web frame, longitudinal stiffeners, brackets, face plate and carlings
-
7. Vertical ladder and step
-
8. Zinc anode
-
9. Air pipe, sounding pipe and extended spindles
-
10. Striking plate underneath sounding pipe, plating underneath bell mouth
No. 1 WBT( Center )
-
1. Forward watertight bulkhead
-
2. Aft watertight bulkhead
-
3. Side shell plating
-
4. Floor (tank slopping plate)
-
5. Upper plating (upper deck under)
-
6. Web frame, longitudinal stiffeners, brackets, face plate and carlings
-
7. Vertical ladder and step
-
8. Zinc anode
-
9. Air pipe, sounding pipe and extended spindles
-
10. Striking plate underneath sounding pipe, plating underneath bell mouth
B-3. Fore Peak Tank Superintendent's Comments :
-
1. Bow :
-
2. Watertight collision bulkhead:
-
3. Stringer deck:
-
4. Floor (bottom shell plating):
-
5. Frmes, longitudinal girders, longitudinal, brackets and carlings:
-
6. Vertical ladder and step:
-
7. Zinc anode:
-
8. Air pipe, sounding pipe and ballast pipe:
-
9. Striking plate underneath sounding pipe, plating underneath bell mouth:
-
10. Hawse pipe:
B-4. Aft Peak Tank Superintendent’s Comments :
-
1. Stern:
-
2. Watertight bulkhead adjacent to engine room:
-
3. Stringer deck:
-
4. Inner bottom:
-
5. Vertical ladder and step:
-
6. Zinc anode:
-
7. Air pipe, sounding pipe and ballast piping:
-
8. Striking plate underneath sounding pipe, plating underneath bell mouth:
B-5. Cargo holds
-
No.1 P Hold
-
No.1 S Hold
-
No.2 P Hold
-
No.2 S Hold
Superintendent’s Comments : No. 1 P.S. CARGO HOLD
-
1. Vertical ladder, step, platform, cover, handrail:
-
2. Forward bulkhead :
-
3. Aft bulkhead:
-
4. Side frames, brackets and pipe:
-
5. Mountain construction, post:
-
6. Chain tunnel:
-
7. Return chain tunnel:
-
8. Chain:
-
9. Manhole cover with coaming:
No. 1 S.S. CARGO HOLD
-
1. Vertical ladder, step, platform, cover, handrail:
-
2. Forward bulkhead :
-
3. Aft bulkhead:
-
4. Side frames, brackets and pipe:
-
5. Mountain construction, post:
-
6. Chain tunnel:
-
7. Return chain tunnel:
-
8. Chain:
-
9. Manhole cover with coaming:
No. 2 P.S. CARGO HOLD
-
1. Vertical ladder, step, platform, cover, handrail:
-
2. Forward bulkhead :
-
3. Aft bulkhead:
-
4. Side frames, brackets and pipe:
-
5. Mountain construction, post:
-
6. Chain tunnel:
-
7. Return chain tunnel:
-
8. Chain:
-
9. Manhole cover with coaming:
-