Information
-
Document number
-
Facade Type
-
Level
-
Elevation
-
Conducted on
-
Prepared by- Lider
CONTROL/CHECK
-
Obtain and check site datums, grids and setting out points
-
Are the units engaged into brackets?
-
Have the unit elements been checked for scratches, dents?
-
Are unit elements installed within specified tolerances?
-
Are the correct fixings used as per provided drawings?
-
Are the gaps between frame elements within the specified tolerances?
-
Has the area been cleaned and waste including COSHH materials removed to allocated bins?
Comments
-
undefined
Inspected by
-
Lider
-
Witnessed by
-
Mace