Personnel in attendance:
Means of Egress
-
Entry and exit doors clearly marked and visible
-
Doors can be opened from inside by way of push down lever?
-
External lock mechanism working and in good order?
Housekeeping
-
Are internal walkways and exit paths clear of obstructions?
-
Are items stored correctly and securely?
Steps, Stairs and Landings
-
Are step treads in good condition, including non slip treatments?
-
Are handrails in good condition?
-
Are steps clear of obstructions?
Lighting
-
Are all work areas, walkways and stairs well lit?
-
Are all lights working?
Electrical
-
Are all power points, light switches and fittings placed safely and free from defects
-
Are isolating switches clearly labelled and readily accessible?
-
Are switchboards readily accessible, clearly labeled and lockable?
-
Have Residual Current Devices been fitted to all circuits?
-
Are all electrical cables either on trays, care arises, or fastened to the structure?
-
Are any data cables either on trays, catenaries, or fastened to the structure?
Machinery
-
Are machine guards in place on all operational equipment. Ensure guards are securely fixed and cannot be altered or removed without tool or key.
-
Are all belts, pulleys and other rotating parts properly guarded?
-
Are emergency shop buttons clearly marked and operational.
-
Are filters in place and fitted correctly?
-
Are all connections tight and closed?
-
Is the machinery free of leaks ?
-
Are all assets identified by way of bar codes or asset tags ?
Pipe Work
-
Are all pipes in good visual condition?
-
Is pipework and flanged joints free of leaks ?
-
Is all pipe work labelled of colour coded?
-
Is lagging in good condition (note for asbestos)
Asbestos Register
-
Was the Asbestos Register checked before undertaking the audit ?
-
Does the Asbestos Register accurately reflect the real condition ?
-
Are there labels on items that contain asbestos ?
Work Areas
-
Is the plant-room in a clean condition ?
-
Is there sufficient space around all plant?
-
Is plant and equipment kept clean and free from obstructions?
-
Is the ventilation of the area adequate?
-
Have necessary steps been taken to reduce noise levels (baffles, mufflers, plant isolation)
-
Are drop offs protected by rails?
-
Is the area free from trip hazards?
Emergency Requirements
-
Is emergency signage in place?
-
Are appropriate fire extinguishers in place and serviced?
Sign off
Sign Off Section
-
Tick the box if this report contains evidence of all relevant items and tasks.
-
Select the name of the person signing off this audit and then select "Sign"
- Barry Russell
- Alan Mason
- Troy Finearty
- Mark White
- Mark Vass
- Scott Bennett
- Roger Wallis
- Andrew Southorn
- Greg Chandler
- Mike Bird
- Other Person
-
if Other Person, then enter name is space below and then select "Sign"
-
Add signature