Step 1 - Initial Assessment
1. Stop, Step back and Think
-
Am I clear on what the task is?
-
Do I have the required skills, training and licenses?
-
Is there a JSEA or SWMS available for this task ?
-
Is my equipment fit and correct for the task and in good working order?
-
Do I have the correct Personal Protective Equipment for the task?
Consider the following permits
-
Is a WORKING AT HEIGHTS permit required ?
-
Simply define task requiring permit:
-
Is a HOT WORK permit required?
-
Simply define task requiring permit:
-
Is a CONFINED SPACE permit required ?
-
Simply define task requiring permit:
-
Is a FIRE SYSTEM IMPAIRMENT permit required ?
-
Simply define task requiring permit:
-
Is a SURFACE PENETRATION or EXCAVATION permit required ?
-
Simply define task requiring permit:
-
Tick the box if you have arranged the required permits.
Step 2 - Hazard / Issue Check
2. Identify the Hazards and Controls with the following JSEA
-
Are there any manual handling hazards?
(Lifting, awkward positions, impacts or over exertion) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Gravity hazards?
(Slips, trips and falls, or being struck by falling objects) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Mechanical hazards?
(Caught in moving parts, struck by plant or flying objects) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Electrical hazards?
(Faulty tools or live power) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Chemical hazards?
(Inhalation, swallowing, acids, solvents or asbestos) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any High Pressure hazards?
(Liquid, gas or air) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Noise hazards?
(Potential hearing damage, masking of emergency alarms) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Biological hazards?
(Potential disease contact, ,zoonoses, animals) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Radiation hazards?
(X-rays, sunlight, ultra violet) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
-
Are there any Environmental hazards?
(Dust, heat, cold, snow, ice) -
What are the HAZARDS or RISKS ? List them here:
-
What CONTROLS are you putting in place to reduce risks to LOW ? List them here:
Step 3 - Final Assessment
3. Consultation with Supervisor or Manager.
-
Did you consult with you or Supervisor or UTAS Contact person for items in Section 2 where you answered YES and during the JSEA preparation
-
List your reason for not contacting your works Supervisor or UTAS Contact person.
4. Make the Hazards safe.
-
Are all hazards now removed or at LOW level?
-
Add reasons below for not reducing the hazard to a LOW risk rating:
-
Where needed, I have updated the JSEA or SWMS for this task?
-
Add the JSEA or SWMS title and reference number below: then forward a copy to your works Supervisor or UTAS Contact person.
5. Is the site now be SAFE so the task can be started ?
-
Tick the box if you have identified and assessed all hazards and made them safe. It is now SAFE to start the work.
6. Contractor / Worker Sign Off
-
Name of Person signing:
- Alan Mason
- Barry Russell
- Troy Finearty
- Roger Wallis
- Greg Chandler
- Andrew Southorn
- Mike Bird
- Other Person
-
Enter name of person signing this audit in the space below then select "Sign"
-
Contractor / Worker Signature