Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
EXCH/FFPxx
-
Terminal ID
-
Add location
-
Please provide photo of terminal in the pit
-
Are all plastic bolts and bungs in manhole lid?
-
Is the stainless steel locking clamp there and in workable condition
-
Are cables correctly managed (including velcro)
-
Is the terminal correctly mounted?
-
Are all bolts correctly installed?
-
Is the lid of the terminal labelled as per the provided FOG
-
Please provide a photo of the closure with the lid off
-
Are all cables correctly sealed
-
Have all fibres been routed correctly on the Trays?
-
If not, please take a photo of the condition
-
Are all unused tubes properly end capped
-
Are tubes cut back to 80mm
-
Are there divisible gas seals installed?
-
Have all cables been correctly labelled and matching the provided FOG plan
-
Is the splitter spliced in and correctly tails routed
-
Do all working tubes have a filo form installed?