Information
-
Visionstream SHE Shutdown Checklist
-
Client / Site
-
Conducted on
-
Prepared by
Environment
-
Have erosion, sediment controls and stock pile been removed from site
-
Has site equipment and machinery been removed from site?
Safety
-
Are All work areas are clear from debris and equipment removed off site? eg: fencing, barriers.
-
Are safety barriers secure (tied/fixed in place)
-
Where practicable, have all excavation been back filled? If not why, and explain how they have protected them. E.g. Plate, safety fences
-
Where excavation are unable to be filled. Are the excavation sites secure? (Barricades have been put in place). Is all temporary reinstatements compliant? E.g. Cold mix
-
Have all trip hazards been eliminated?
-
Are all signs removed from site? (Except sites with open/secured excavations).
Completed audit
-
Other Comments
-
Signature of Site Manager Representative
-
Date
-
Completed checklists should be emailed to Melanie.dawson@visionstream.co.nz