Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Has asbestos been removed to satisfaction of inspector.

  • Is work area specific to scope of works safe for re-entry?

  • Can works continue / re-commence?

  • Visual clearance certificate issued by inspector?

  • Is clearance for a piece of plant?

  • Time and Date of Inspection

  • Location and Type of Asbestos Removed

  • Location and Type of Asbestos Removed

  • Location and Type of Asbestos Removed

  • No visible asbestos containing material debris/residue remaining in immediate area and/or surrounding area of asbestos removal.

  • Class of Asbestos Material

  • Appropriate method of removed, including PPE?

  • Exclusions

  • Exclusions

  • Exclusions

  • Extra information of areas requiring further attention.

  • Other issues requiring attention.

  • Removal conducted under air monitoring?

  • Photograph of Site (if applicable)

  • DISCLAIMER : This certificate is valid at the time of issuance and until the site is re-entered or altered. Once the site is changed from its state at the time of inspection the certificate is null and void, and any variances post-inspection will require a further inspection. G.E.O.H. Holds no responsibility to the client following the re-entry and re-commencement of works. If you have any queries or issues with the aforementioned please discuss it with your hygienist prior to the hand over of the site.

  • SIGNED :

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.