What are you pressure testing?
- BOP Stump Test
- 1502 Iron Test
- Lubricators
- X-Overs
-
What type of test are you conducting?
- Pre-Job
- Annual
- Visual
-
Date
-
What is your task?
-
Equipment being worked on?
- BOP Stump Test
- 1502 Iron Test
- Lubricators
- X-Overs
-
What type of test are you conducting?
- Pre-Job
- Annual
- Visual
-
Activity?
-
Equipment being pressure tested?
-
Inspector
-
Boyd is signed off on WE SOP 1300-165?
-
Who is Supervising?
-
Matt is signed off on WE SOP 1300-165?
-
Who is Supervising?
-
Josh is signed off on WE SOP 1300-165?
-
Who is Supervising?
Safety Protocol
-
Has a JSA been filled out?
-
Has the office been notified?
-
Is the area safe and demarcated?
Pre-Test Inspection
-
Has the BOP been opened, cleaned & serviced since last operation?
-
BOPs are dressed for correct tubing size?
-
BOP lifting sling – visually inspect for damage and wear
-
Are the hoses & connections in good condition with certification tags visible?
-
Check Allen head locking bolts are installed and tight
-
Check ram 1/4 turn lock orientated vertical and in place
-
Ram Function - cycle all rams close and open
-
Ram equalising valves - function test and check pump through
Pressure Testing
-
Have the BOP's been successfully tested & recorded?
-