Title Page
-
Inspector:
-
Supervisor:
-
Company:
-
Location:
-
Date:
INSPECTION
-
Has the SWMS / PRA for Pressure Vessels been signed by all personnel on site for transferring binder to / from ISO Tankers
-
Has the daily JobSTART been completed and communicated to workers
-
Lime / Cement tanker truck has clear access to working area
-
Has a PreSTART been conducted on the tank and compressor
-
Does the ISO tanker have a current inspection certificate
-
Are warning and operation signs clearly visible
-
Are whip-checks fitted to the compressor and product transfer hoses
-
Are hoses and fittings in good condition (e.g. no tears / cracks, hose clamps in good condition etc)
-
Are safety bump locks for camlocks available for compressor and product transfer hoses and used during product transfer
-
Is suitable PPE available and being worn by all personnel?
-
Are Cement / Lime hoses appropriately positioned and secured agains damage when pumping?
-
Lime / Cement collected in filter sock to suppress dust and excess product approprately disposed of?
-
Waste Cement / Lime placed in designated area as instructed by supervisor/manager as per client requirements
-
Are couplings in good order and correctly fitted (all couplings must be secured using crimp clamps, bolt-on clamps are no longer fit for purpose)
-
If a pressurised tanker is left unattended, the pressure is vented and vent ports left open
Inspection Team
-
Signature:
-
Signature:
-
Signature: